Difference: AnalysisTaskList (9 vs. 10)

Revision 102009-01-14 - BrendanKiburg

Line: 1 to 1
 -- BrendanKiburg - 08 Oct 2008

The idea here is to list open questions, outline the proposed method for answering the questions, and prioritize the tasks.

Added:
>
>

New issues

  • Brief elog to address mustop distributions during various kicker periods : elog 159
  • First draft of spreadsheet organizing analysis plots : elog 160
 

Questions Generated from recent teleconference

  • How does the electron decay vector affect the observed nContEH parameter: elog 154
  • Dave suggests start time scan for midplane gondolas, without nContEH cut. If OEH mustops leak into 1EH mustops, this should disappear at some point and become stable. elog 152
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2020 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback