-- PeterKammel - 20 Jan 2010

Dates

  • Progress & PAC
    • PAC on February 17 - 19, 2010.
    • PAC email by Claude:
      Dear all,

      on Thursday, FEB-18, Peter and Sasha made an important open presentation
      on the status of the musun experiment at the BV41 users meeting
      (program see http://ltp.web.psi.ch/user_information/Program41-1.pdf ).

      The written report which we submitted as well as the open presentation
      was very well received by the scientific committee and our beam
      requests for 2010 were accepted, although we could not get the last
      production cycle in December 2010. So our allocated beamtimes in 2010
      are as follows:

      April-30 to May-24, 2010: 3.5 weeks for a commissioning run at the
      piE3 beam. The apparatus can be setup in the piE3 area prior
      to this period.

      October-7 to November-29, 2010: 8-weeks for a first production run
      at the piE3 beam.

      It was again stated that 2011 will be the last year for us to use
      the piE3 beam, because after that year the area will be dedicated
      to a new high-field muSR-facility.

      For this reason, a test week in area piE1 is scheduled in
      August-30 to September-6, 2010 to demonstrate the suitability
      of the piE1 beam for musun runs after 2011.

      We like to thank all collaborators for the preparation of the
      progress report and the effort in preparing the presentations!

      With best regards

      Sasha, Peter and Claude

  • Konrad

Hallo Peter, offiziell sind alle grösseren Arbeiten bis zum 16.4. 
abgeschlossen. Wir werden, um Konflikten vorzubeugen, Ende März / Anfang 
 April beginnen eure Strahllinie aufzubauen.
Wir sollten allerdings abwarten, bis die Arealerweiterung gemacht ist. 
Da ist noch als unbekannte die Lieferung der neuen Abschirmsteine.

Gruss
Konrad

-- 
=============================
Konrad Deiters

GFA - Accelerator Division
Leader HE-Beam Lines Section

Tel.: +41 56 310 42 41
Fax : +41 56 310 32 94
http://www.psi.ch/
Paul Scherrer Institut
CH-5232 Villigen / PSI
============================= 

>
>
Please go to https://muon.npl.washington.edu/twiki/bin/view/Main/Chrono2010
 
META FILEATTACHMENT attachment="2010_visits_plan.xls" attr="" comment="" date="1264021165" name="2010_visits_plan.xls" path="2010_visits_plan.xls" size="111104" stream="2010_visits_plan.xls" tmpFilename="/tmp/WZsPqrIs_s" user="PeterKammel" version="1"
META FILEATTACHMENT attachment="2010_visits_revised.xls" attr="" comment="" date="1264087675" name="2010_visits_revised.xls" path="2010_visits_revised.xls" size="19456" stream="2010_visits_revised.xls" tmpFilename="/tmp/2pmbFt7Ot_" user="PeterKammel" version="1"

Revision 52010-03-02 - PeterKammel

Line: 1 to 1
 
META TOPICPARENT name="MuSunGroup"
-- PeterKammel - 20 Jan 2010

Dates

  • Progress & PAC
    • PAC on February 17 - 19, 2010.
Changed:
<
<
    • PAC email by Claude:

Dear all,

on Thursday, FEB-18, Peter and Sasha made an important open presentation
on the status of the musun experiment at the BV41 users meeting
(program see http://ltp.web.psi.ch/user_information/Program41-1.pdf ).

The written report which we submitted as well as the open presentation
was very well received by the scientific committee and our beam
requests for 2010 were accepted, although we could not get the last
production cycle in December 2010. So our allocated beamtimes in 2010
are as follows:

April-30 to May-24, 2010: 3.5 weeks for a commissioning run at the
piE3 beam. The apparatus can be setup in the piE3 area prior
to this period.

October-7 to November-29, 2010: 8-weeks for a first production run
at the piE3 beam.

It was again stated that 2011 will be the last year for us to use
the piE3 beam, because after that year the area will be dedicated
to a new high-field muSR-facility.

For this reason, a test week in area piE1 is scheduled in
August-30 to September-6, 2010 to demonstrate the suitability
of the piE1 beam for musun runs after 2011.

We like to thank all collaborators for the preparation of the
progress report and the effort in preparing the presentations!

With best regards

Sasha, Peter and Claude


>
>
    • PAC email by Claude:
      Dear all,

      on Thursday, FEB-18, Peter and Sasha made an important open presentation
      on the status of the musun experiment at the BV41 users meeting
      (program see http://ltp.web.psi.ch/user_information/Program41-1.pdf ).

      The written report which we submitted as well as the open presentation
      was very well received by the scientific committee and our beam
      requests for 2010 were accepted, although we could not get the last
      production cycle in December 2010. So our allocated beamtimes in 2010
      are as follows:

      April-30 to May-24, 2010: 3.5 weeks for a commissioning run at the
      piE3 beam. The apparatus can be setup in the piE3 area prior
      to this period.

      October-7 to November-29, 2010: 8-weeks for a first production run
      at the piE3 beam.

      It was again stated that 2011 will be the last year for us to use
      the piE3 beam, because after that year the area will be dedicated
      to a new high-field muSR-facility.

      For this reason, a test week in area piE1 is scheduled in
      August-30 to September-6, 2010 to demonstrate the suitability
      of the piE1 beam for musun runs after 2011.

      We like to thank all collaborators for the preparation of the
      progress report and the effort in preparing the presentations!

      With best regards

      Sasha, Peter and Claude

  • Konrad

Hallo Peter, offiziell sind alle grösseren Arbeiten bis zum 16.4. 
abgeschlossen. Wir werden, um Konflikten vorzubeugen, Ende März / Anfang 
 April beginnen eure Strahllinie aufzubauen.
Wir sollten allerdings abwarten, bis die Arealerweiterung gemacht ist. 
Da ist noch als unbekannte die Lieferung der neuen Abschirmsteine.

Gruss
Konrad

-- 
=============================
Konrad Deiters

GFA - Accelerator Division
Leader HE-Beam Lines Section

Tel.: +41 56 310 42 41
Fax : +41 56 310 32 94
http://www.psi.ch/
Paul Scherrer Institut
CH-5232 Villigen / PSI
============================= 
 

Revision 42010-02-25 - PeterKammel

Line: 1 to 1
 
META TOPICPARENT name="MuSunGroup"
-- PeterKammel - 20 Jan 2010

Dates

  • Progress & PAC
    • PAC on February 17 - 19, 2010.
Added:
>
>
    • PAC email by Claude:

Dear all,

on Thursday, FEB-18, Peter and Sasha made an important open presentation
on the status of the musun experiment at the BV41 users meeting
(program see http://ltp.web.psi.ch/user_information/Program41-1.pdf ).

The written report which we submitted as well as the open presentation
was very well received by the scientific committee and our beam
requests for 2010 were accepted, although we could not get the last
production cycle in December 2010. So our allocated beamtimes in 2010
are as follows:

April-30 to May-24, 2010: 3.5 weeks for a commissioning run at the
piE3 beam. The apparatus can be setup in the piE3 area prior
to this period.

October-7 to November-29, 2010: 8-weeks for a first production run
at the piE3 beam.

It was again stated that 2011 will be the last year for us to use
the piE3 beam, because after that year the area will be dedicated
to a new high-field muSR-facility.

For this reason, a test week in area piE1 is scheduled in
August-30 to September-6, 2010 to demonstrate the suitability
of the piE1 beam for musun runs after 2011.

We like to thank all collaborators for the preparation of the
progress report and the effort in preparing the presentations!

With best regards

Sasha, Peter and Claude


 

Revision 32010-02-02 - PeterKammel

Line: 1 to 1
 
META TOPICPARENT name="MuSunGroup"
-- PeterKammel - 20 Jan 2010

Dates

Line: 7 to 7
 
Changed:
<
<
>
>
 
META FILEATTACHMENT attachment="2010_visits_plan.xls" attr="" comment="" date="1264021165" name="2010_visits_plan.xls" path="2010_visits_plan.xls" size="111104" stream="2010_visits_plan.xls" tmpFilename="/tmp/WZsPqrIs_s" user="PeterKammel" version="1"
META FILEATTACHMENT attachment="2010_visits_revised.xls" attr="" comment="" date="1264087675" name="2010_visits_revised.xls" path="2010_visits_revised.xls" size="19456" stream="2010_visits_revised.xls" tmpFilename="/tmp/2pmbFt7Ot_" user="PeterKammel" version="1"

Revision 22010-01-21 - PeterKammel

Line: 1 to 1
 
META TOPICPARENT name="MuSunGroup"
-- PeterKammel - 20 Jan 2010

Dates

Line: 7 to 7
 
Added:
>
>
 
META FILEATTACHMENT attachment="2010_visits_plan.xls" attr="" comment="" date="1264021165" name="2010_visits_plan.xls" path="2010_visits_plan.xls" size="111104" stream="2010_visits_plan.xls" tmpFilename="/tmp/WZsPqrIs_s" user="PeterKammel" version="1"
Added:
>
>
META FILEATTACHMENT attachment="2010_visits_revised.xls" attr="" comment="" date="1264087675" name="2010_visits_revised.xls" path="2010_visits_revised.xls" size="19456" stream="2010_visits_revised.xls" tmpFilename="/tmp/2pmbFt7Ot_" user="PeterKammel" version="1"

Revision 12010-01-20 - PeterKammel

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="MuSunGroup"
-- PeterKammel - 20 Jan 2010

Dates

  • Progress & PAC
    • PAC on February 17 - 19, 2010.

META FILEATTACHMENT attachment="2010_visits_plan.xls" attr="" comment="" date="1264021165" name="2010_visits_plan.xls" path="2010_visits_plan.xls" size="111104" stream="2010_visits_plan.xls" tmpFilename="/tmp/WZsPqrIs_s" user="PeterKammel" version="1"
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2022 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback