Difference: MuCap06May09 (3 vs. 4)

Revision 42009-05-06 - SaraKnaack

Line: 1 to 1
 
META TOPICPARENT name="MuCapTelCo"
Changed:
<
<
-- SaraKnaack - 05 May 2009 -- SaraKnaack - 28 Apr 2009 SET ALLOWTOPICCHANGE = MuSunGroup SET ALLOWTOPICCHANGE = MuCapGroup
>
>
-- SaraKnaack - 05 May 2009 -- SaraKnaack - 28 Apr 2009 SET ALLOWTOPICCHANGE = MuSunGroup SET ALLOWTOPICCHANGE = MuCapGroup
  Agenda for the MuCap Teleconference on May 6th, 2009:

MuCap related topics

  1. Brendan: fitting elog, computing update
Changed:
<
<
  1. Sara: Update on electron and capture time spectrum fit results - a comparison - the first steps to a combined analysis.
>
>
  1. Sara: Update on electron and capture time spectrum fit results - a comparison - the first steps to a combined analysis in ArOverview.
 
  1. Peter W.: Update on the mu+ fits: eLog:236

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2020 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback