Difference: MuCap09Jul08 (2 vs. 3)

Revision 32008-07-09 - SaraKnaack

Line: 1 to 1
 
META TOPICPARENT name="MuCapTelCo"
-- SaraKnaack - 08 Jul 2008 SET ALLOWTOPICCHANGE = MuSunGroup
Line: 6 to 6
  Agenda for the MuCap / MuSun teleconference on July 9th, 2008:
Changed:
<
<

MuCap related topics

>
>

Agenda Items

 
  1. Brendan: Production update. production status
Changed:
<
<
  1. Sara: Brief Ar Analysis Update - Updated 1 mm Y Cut scans at Y Cut Studies

MuSun related topics

  1. None established yet. (07/09)
>
>
  1. Sara: Brief Ar Analysis Update - Kinetics caluclations for O and N contamination studies, TMucapArKinetics
  2. Tim: Neutron Analysis update in the e-log at analysis-run9to11/55.
 

You can call in using Skype for free using the following number: +99008275445542

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2020 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback