Difference: MuCap13Aug08 (1 vs. 5)

Revision 52008-08-13 - VladimirTishchenko

Line: 1 to 1
 
META TOPICPARENT name="MuCapTelCo"
-- SaraKnaack - 12 Aug 2008
Line: 12 to 12
 
  1. Peter W:
    • New CVS repository for jobscripts at Abe: eLog:81
    • Control histogram added for monitoring of merging success: eLog:83
Added:
>
>
  1. Volodya: quick update on testing WFD for max. block length and max. number of presamples musun/25 - MuSun topic
 

You can call in using Skype for free using the following number: +99008275445542

Revision 42008-08-13 - PeterWinter

Line: 1 to 1
 
META TOPICPARENT name="MuCapTelCo"
-- SaraKnaack - 12 Aug 2008
Line: 9 to 9
 

Agenda Items

  1. Sara: Brief Ar Analysis Update - Kinetics simulations for O and N contamination studies, TMucapArKinetics , and electron time spectrum start and stop time fit scans in e-log analysis-run9to11/82.
Changed:
<
<
  1. Peter W: New CVS repository for jobscripts at Abe: eLog:81
>
>
  1. Peter W:
    • New CVS repository for jobscripts at Abe: eLog:81
    • Control histogram added for monitoring of merging success: eLog:83
 

You can call in using Skype for free using the following number: +99008275445542

Revision 32008-08-13 - SaraKnaack

Line: 1 to 1
 
META TOPICPARENT name="MuCapTelCo"
Deleted:
<
<
 -- SaraKnaack - 12 Aug 2008

SET ALLOWTOPICCHANGE = MuSunGroup

Line: 9 to 8
 Agenda for the MuCap teleconference on August 13th, 2008:

Agenda Items

Changed:
<
<
  1. Brendan: Production update. production status?
  2. Sara: Brief Ar Analysis Update - Kinetics calculations for O and N contamination studies, TMucapArKinetics
  3. Tim: Neutron Analysis update in the e-log at analysis-run9to11/55.?
>
>
  1. Sara: Brief Ar Analysis Update - Kinetics simulations for O and N contamination studies, TMucapArKinetics , and electron time spectrum start and stop time fit scans in e-log analysis-run9to11/82.
 
  1. Peter W: New CVS repository for jobscripts at Abe: eLog:81

Revision 22008-08-12 - PeterWinter

Line: 1 to 1
 
META TOPICPARENT name="MuCapTelCo"
Deleted:
<
<
 -- SaraKnaack - 12 Aug 2008

SET ALLOWTOPICCHANGE = MuSunGroup

Line: 13 to 12
 
  1. Brendan: Production update. production status?
  2. Sara: Brief Ar Analysis Update - Kinetics calculations for O and N contamination studies, TMucapArKinetics
  3. Tim: Neutron Analysis update in the e-log at analysis-run9to11/55.?
Added:
>
>
  1. Peter W: New CVS repository for jobscripts at Abe: eLog:81
 

You can call in using Skype for free using the following number: +99008275445542

Revision 12008-08-12 - SaraKnaack

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="MuCapTelCo"

-- SaraKnaack - 12 Aug 2008

SET ALLOWTOPICCHANGE = MuSunGroup SET ALLOWTOPICCHANGE = MuCapGroup

Agenda for the MuCap teleconference on August 13th, 2008:

Agenda Items

  1. Brendan: Production update. production status?
  2. Sara: Brief Ar Analysis Update - Kinetics calculations for O and N contamination studies, TMucapArKinetics
  3. Tim: Neutron Analysis update in the e-log at analysis-run9to11/55.?

You can call in using Skype for free using the following number: +99008275445542

Or there is a toll service number +1 605 475 8500

Unless you are using the Skype link above, you will then need to type in addition our conference room number which is: 5445542

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback