Difference: MuCap13Feb08 (1 vs. 3)

Revision 32008-02-19 - SaraKnaack

Line: 1 to 1
 
META TOPICPARENT name="MuCapTelCo"
SET ALLOWTOPICCHANGE = MuSunGroup SET ALLOWTOPICCHANGE = MuCapGroup

Revision 22008-02-13 - SaraKnaack

Line: 1 to 1
 
META TOPICPARENT name="MuCapTelCo"
SET ALLOWTOPICCHANGE = MuSunGroup SET ALLOWTOPICCHANGE = MuCapGroup
Line: 7 to 7
 

MuCap related topics

  1. Brendan: Update on the progress toward the mini production pass at NCSA. MiniProd2Run10
Changed:
<
<
>
>
  1. Tim: Neutron analysis update
 

MuSun related topics

  1. None planned at present. (11/2)

Revision 12008-02-11 - SaraKnaack

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="MuCapTelCo"
SET ALLOWTOPICCHANGE = MuSunGroup SET ALLOWTOPICCHANGE = MuCapGroup

Here's the agenda for the MuCap / MuSun teleconference on February, 6 2008:

MuCap related topics

  1. Brendan: Update on the progress toward the mini production pass at NCSA. MiniProd2Run10

MuSun related topics

  1. None planned at present. (11/2)


You can call in using Skype for free using the following number: +99008275445542

Or there is a toll service number +1 605 475 8500

Unless you are using the Skype link above, you will then need to type in addition our conference room number which is: 5445542

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback