Difference: MuCap16Jul08 (1 vs. 2)

Revision 22008-07-15 - PeterWinter

Line: 1 to 1
 
META TOPICPARENT name="MuCapTelCo"
SET ALLOWTOPICCHANGE = MuSunGroup SET ALLOWTOPICCHANGE = MuCapGroup
Line: 9 to 9
 
  1. Brendan: Production update. production status
  2. Sara: Brief Ar Analysis Update - Kinetics calculations for O and N contamination studies, TMucapArKinetics
  3. Tim: Neutron Analysis update in the e-log at analysis-run9to11/55.
Added:
>
>
  1. Peter W.: Initializing discussion for the plans for the collab meeting.
 

You can call in using Skype for free using the following number: +99008275445542

Revision 12008-07-15 - SaraKnaack

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="MuCapTelCo"
SET ALLOWTOPICCHANGE = MuSunGroup SET ALLOWTOPICCHANGE = MuCapGroup

Agenda for the MuCap / MuSun teleconference on July 16th, 2008:

Agenda Items

  1. Brendan: Production update. production status
  2. Sara: Brief Ar Analysis Update - Kinetics calculations for O and N contamination studies, TMucapArKinetics
  3. Tim: Neutron Analysis update in the e-log at analysis-run9to11/55.

You can call in using Skype for free using the following number: +99008275445542

Or there is a toll service number +1 605 475 8500

Unless you are using the Skype link above, you will then need to type in addition our conference room number which is: 5445542

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2020 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback