Difference: MuCap17Jun09 (1 vs. 6)

Revision 62009-06-17 - TimGorringe

Line: 1 to 1
 
META TOPICPARENT name="MuCapTelCo"
-- SaraKnaack - 16 Jun 2009 SET ALLOWTOPICCHANGE = MuSunGroup SET ALLOWTOPICCHANGE = MuCapGroup
Line: 9 to 9
 
    1. Current Production Summary: elog 287
    2. Neat new production failure mode : elog 286
    3. Some Physics Oriented Plots : elog 288
Changed:
<
<
  1. Tim: neutron update: elog 288
>
>
  1. Tim: neutron update: elog 290
 
  1. Tim: electron update: elog 285

MuSun related topics

  1. Serdar

Revision 52009-06-17 - SerdarKizilgul

Line: 1 to 1
 
META TOPICPARENT name="MuCapTelCo"
-- SaraKnaack - 16 Jun 2009 SET ALLOWTOPICCHANGE = MuSunGroup SET ALLOWTOPICCHANGE = MuCapGroup
Line: 17 to 17
 
    1. New pedestal calculations elog 25
    2. Some result from elementary pulse finding algorithm elog 26
    3. Testing elementary pulse finder elog 27
Changed:
<
<
    1. Testing pulse finder with double pulses from run2933 [http://www.npl.illinois.edu/elog/musun/analysis-run1/28][elog 28]]
    2. Testing pulse finder with real run 1661 [http://www.npl.illinois.edu/elog/musun/analysis-run1/29][elog 29]]
    3. Picking runs for resolution and filtering studies [http://www.npl.illinois.edu/elog/musun/analysis-run1/30][elog 30]]
    4. Digital filtering study [http://www.npl.illinois.edu/elog/musun/analysis-run1/31][elog 31]]
    5. Pulse Resolution study [http://www.npl.illinois.edu/elog/musun/analysis-run1/32][elog 32]]
    6. Pulse Finding Algorithm [http://www.npl.illinois.edu/elog/musun/analysis-run1/33][elog 33]]
>
>
    1. Testing pulse finder with double pulses from run2933 elog 28
    2. Testing pulse finder with real run 1661 elog 29
    3. Picking runs for resolution and filtering studies elog 30
    4. Digital filtering study elog 31
    5. Pulse Resolution study elog 32
    6. Pulse Finding Algorithm elog 33
 

Call Information

Revision 42009-06-17 - TimGorringe

Line: 1 to 1
 
META TOPICPARENT name="MuCapTelCo"
-- SaraKnaack - 16 Jun 2009 SET ALLOWTOPICCHANGE = MuSunGroup SET ALLOWTOPICCHANGE = MuCapGroup
Line: 9 to 9
 
    1. Current Production Summary: elog 287
    2. Neat new production failure mode : elog 286
    3. Some Physics Oriented Plots : elog 288
Added:
>
>
  1. Tim: neutron update: elog 288
  2. Tim: electron update: elog 285
 

MuSun related topics

  1. Serdar
    1. Some result from previous pulse finder elog 24

Revision 32009-06-17 - SerdarKizilgul

Line: 1 to 1
 
META TOPICPARENT name="MuCapTelCo"
-- SaraKnaack - 16 Jun 2009 SET ALLOWTOPICCHANGE = MuSunGroup SET ALLOWTOPICCHANGE = MuCapGroup
Line: 10 to 10
 
    1. Neat new production failure mode : elog 286
    2. Some Physics Oriented Plots : elog 288

MuSun related topics

Changed:
<
<
  1. None as of 6/16/2009
>
>
  1. Serdar
    1. Some result from previous pulse finder elog 24
    2. New pedestal calculations elog 25
    3. Some result from elementary pulse finding algorithm elog 26
    4. Testing elementary pulse finder elog 27
    5. Testing pulse finder with double pulses from run2933 [http://www.npl.illinois.edu/elog/musun/analysis-run1/28][elog 28]]
    6. Testing pulse finder with real run 1661 [http://www.npl.illinois.edu/elog/musun/analysis-run1/29][elog 29]]
    7. Picking runs for resolution and filtering studies [http://www.npl.illinois.edu/elog/musun/analysis-run1/30][elog 30]]
    8. Digital filtering study [http://www.npl.illinois.edu/elog/musun/analysis-run1/31][elog 31]]
    9. Pulse Resolution study [http://www.npl.illinois.edu/elog/musun/analysis-run1/32][elog 32]]
    10. Pulse Finding Algorithm [http://www.npl.illinois.edu/elog/musun/analysis-run1/33][elog 33]]
 

Call Information

Revision 22009-06-17 - BrendanKiburg

Line: 1 to 1
 
META TOPICPARENT name="MuCapTelCo"
Changed:
<
<
-- SaraKnaack - 16 Jun 2009 SET ALLOWTOPICCHANGE = MuSunGroup SET ALLOWTOPICCHANGE = MuCapGroup
>
>
-- SaraKnaack - 16 Jun 2009 SET ALLOWTOPICCHANGE = MuSunGroup SET ALLOWTOPICCHANGE = MuCapGroup
  Agenda for the MuCap Teleconference on June 17th, 2009:

MuCap related topics

Added:
>
>
  1. Brendan
    1. Current Production Summary: elog 287
    2. Neat new production failure mode : elog 286
    3. Some Physics Oriented Plots : elog 288
 

MuSun related topics

  1. None as of 6/16/2009

Revision 12009-06-16 - SaraKnaack

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="MuCapTelCo"
-- SaraKnaack - 16 Jun 2009 SET ALLOWTOPICCHANGE = MuSunGroup SET ALLOWTOPICCHANGE = MuCapGroup

Agenda for the MuCap Teleconference on June 17th, 2009:

MuCap related topics

MuSun related topics

  1. None as of 6/16/2009

Call Information

In the US, call #1-218-486-3600 (long distance charges apply).

Calling from Europe, call: Austria 0820 4000 1577 UK 0870 738 0765 Germany 01805 007642 France 0826 100 280 Belgium 070 35 9992 Spain 0902 886 056 Switzerland 0848 560 327 Ireland 0818 270 037 Italy 0848 390 179 The conference is free but national rate charges will apply to these calls.

Enter the Room Number: 4035734

Features Available During the Conference (*1) Play menu of features so you know what's available

(*2) Mute your own line so other people can't hear you talking

(*3) Unmute your line so you can contribute to the conference

(*4) Hear the number of callers who are on the conference(*4) Hear the number of callers who are on the conference

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback