Difference: MuCap17Jun09 (2 vs. 3)

Revision 32009-06-17 - SerdarKizilgul

Line: 1 to 1
 
META TOPICPARENT name="MuCapTelCo"
-- SaraKnaack - 16 Jun 2009 SET ALLOWTOPICCHANGE = MuSunGroup SET ALLOWTOPICCHANGE = MuCapGroup
Line: 10 to 10
 
    1. Neat new production failure mode : elog 286
    2. Some Physics Oriented Plots : elog 288

MuSun related topics

Changed:
<
<
  1. None as of 6/16/2009
>
>
  1. Serdar
    1. Some result from previous pulse finder elog 24
    2. New pedestal calculations elog 25
    3. Some result from elementary pulse finding algorithm elog 26
    4. Testing elementary pulse finder elog 27
    5. Testing pulse finder with double pulses from run2933 [http://www.npl.illinois.edu/elog/musun/analysis-run1/28][elog 28]]
    6. Testing pulse finder with real run 1661 [http://www.npl.illinois.edu/elog/musun/analysis-run1/29][elog 29]]
    7. Picking runs for resolution and filtering studies [http://www.npl.illinois.edu/elog/musun/analysis-run1/30][elog 30]]
    8. Digital filtering study [http://www.npl.illinois.edu/elog/musun/analysis-run1/31][elog 31]]
    9. Pulse Resolution study [http://www.npl.illinois.edu/elog/musun/analysis-run1/32][elog 32]]
    10. Pulse Finding Algorithm [http://www.npl.illinois.edu/elog/musun/analysis-run1/33][elog 33]]
 

Call Information

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2020 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback