Difference: MuCap20Aug08 (1 vs. 7)

Revision 72008-08-20 - SaraKnaack

Line: 1 to 1
 
META TOPICPARENT name="MuCapTelCo"
SET ALLOWTOPICCHANGE = MuSunGroup SET ALLOWTOPICCHANGE = MuCapGroup
Line: 11 to 11
 
  1. Peter W:
    • Work in progress with FADC analysis: eLog:87
    • Re-merging for mu+: eLog:88
Added:
>
>
  1. Volodya: update on WFD tests for number of presamples musun/25 and clock frequency - MuSun topic
 

You can call in using Skype for free using the following number: +99008275445542

Revision 62008-08-20 - PeterWinter

Line: 1 to 1
 
META TOPICPARENT name="MuCapTelCo"
SET ALLOWTOPICCHANGE = MuSunGroup SET ALLOWTOPICCHANGE = MuCapGroup
Line: 8 to 8
 

Agenda Items

  1. Brendan: eLog:86
  2. Sara: Brief Ar Analysis Update - Kinetics simulations for O and N contamination studies, TMucapArKinetics.
Changed:
<
<
  1. Peter W: Work in progress with FADC analysis: eLog:87
>
>
  1. Peter W:
    • Work in progress with FADC analysis: eLog:87
    • Re-merging for mu+: eLog:88
 

You can call in using Skype for free using the following number: +99008275445542

Revision 52008-08-20 - SaraKnaack

Line: 1 to 1
 
META TOPICPARENT name="MuCapTelCo"
SET ALLOWTOPICCHANGE = MuSunGroup SET ALLOWTOPICCHANGE = MuCapGroup
Line: 7 to 7
 

Agenda Items

  1. Brendan: eLog:86
Changed:
<
<
  1. Sara: Brief Ar Analysis Update - Kinetics simulations for O and N contamination studies, TMucapArKinetics , and electron time spectrum start and stop time fit scans in e-log analysis-run9to11/82.
>
>
  1. Sara: Brief Ar Analysis Update - Kinetics simulations for O and N contamination studies, TMucapArKinetics.
 
  1. Peter W: Work in progress with FADC analysis: eLog:87
Deleted:
<
<
  1. Volodya: update on WFD tests for number of presamples musun/25 and clock frequency - MuSun topic
 

You can call in using Skype for free using the following number: +99008275445542

Revision 42008-08-20 - PeterWinter

Line: 1 to 1
 
META TOPICPARENT name="MuCapTelCo"
SET ALLOWTOPICCHANGE = MuSunGroup SET ALLOWTOPICCHANGE = MuCapGroup
Line: 8 to 8
 

Agenda Items

  1. Brendan: eLog:86
  2. Sara: Brief Ar Analysis Update - Kinetics simulations for O and N contamination studies, TMucapArKinetics , and electron time spectrum start and stop time fit scans in e-log analysis-run9to11/82.
Added:
>
>
  1. Peter W: Work in progress with FADC analysis: eLog:87
 
  1. Volodya: update on WFD tests for number of presamples musun/25 and clock frequency - MuSun topic

Revision 32008-08-20 - VladimirTishchenko

Line: 1 to 1
 
META TOPICPARENT name="MuCapTelCo"
SET ALLOWTOPICCHANGE = MuSunGroup SET ALLOWTOPICCHANGE = MuCapGroup
Line: 8 to 8
 

Agenda Items

  1. Brendan: eLog:86
  2. Sara: Brief Ar Analysis Update - Kinetics simulations for O and N contamination studies, TMucapArKinetics , and electron time spectrum start and stop time fit scans in e-log analysis-run9to11/82.
Changed:
<
<
  1. Volodya: quick update on testing WFD for max. block length and max. number of presamples musun/25 - MuSun topic
>
>
  1. Volodya: update on WFD tests for number of presamples musun/25 and clock frequency - MuSun topic
 

You can call in using Skype for free using the following number: +99008275445542

Revision 22008-08-19 - PeterWinter

Line: 1 to 1
 
META TOPICPARENT name="MuCapTelCo"
SET ALLOWTOPICCHANGE = MuSunGroup SET ALLOWTOPICCHANGE = MuCapGroup
Line: 8 to 8
 

Agenda Items

  1. Brendan: eLog:86
  2. Sara: Brief Ar Analysis Update - Kinetics simulations for O and N contamination studies, TMucapArKinetics , and electron time spectrum start and stop time fit scans in e-log analysis-run9to11/82.
Deleted:
<
<
  1. Peter W:
    • New CVS repository for jobscripts at Abe: eLog:81
    • Control histogram added for monitoring of merging success: eLog:83
 
  1. Volodya: quick update on testing WFD for max. block length and max. number of presamples musun/25 - MuSun topic

Revision 12008-08-19 - SaraKnaack

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="MuCapTelCo"
SET ALLOWTOPICCHANGE = MuSunGroup SET ALLOWTOPICCHANGE = MuCapGroup

Agenda for the MuCap teleconference on August 20th, 2008:

Agenda Items

  1. Brendan: eLog:86
  2. Sara: Brief Ar Analysis Update - Kinetics simulations for O and N contamination studies, TMucapArKinetics , and electron time spectrum start and stop time fit scans in e-log analysis-run9to11/82.
  3. Peter W:
    • New CVS repository for jobscripts at Abe: eLog:81
    • Control histogram added for monitoring of merging success: eLog:83
  4. Volodya: quick update on testing WFD for max. block length and max. number of presamples musun/25 - MuSun topic

You can call in using Skype for free using the following number: +99008275445542

Or there is a toll service number +1 605 475 8500

Unless you are using the Skype link above, you will then need to type in addition our conference room number which is: 5445542

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback