Difference: MuSunRun1Summary (1 vs. 11)

Revision 112011-04-22 - PeterWinter

Line: 1 to 1
 
META TOPICPARENT name="MuSunRun1Analysis"
Changed:
<
<
-- SerdarKizilgul - 18 Mar 2009

Run1 Summary

The first MuSun musun run was started Nov. 3rd and completed Dec. 18th of 2008 at PSI, Switzerland.

Total 7405 runs were collected during one month of actual run period.

One copy of the 71 tapes are in room 428 Loomis Lab, Illinois.

7217 runs (8.9 TB) were copied to the NPL and then copied to NCSA FTP server (mss.ncsa.uiuc.edu) in the directory /home/kizilgul/Runs1.

The run log database is on the MYSQL server, which can be reached from any NPL computers with npl ~> mysql -h mysql -u musun -p.

Total 5183 runs (4532 mu-, 653 mu+) are marked as a good ('Y') quality production run.

The 'Y' quality runs take 7.5 TB disk space

During the runs, logs are recorded online to run1 elogs.

The summary of the elogs created for data classification.

Before the data classification, the mysql database has been updated according to elogs.

The overview of the run1 is done by Peter K.

Run1 Statistics

Table 1: Runs by Quality

Quality Number of Runs
Size (TB)
Y (Good runs) 51837.511
T (Test or Calibration) 7420.518
N (Not Good)
8770.355
P (Problems) 290.022
K (Kicker problem)
3680.525

Table 2: Runs by TPC Gas

TPC Gas
Number of runs
start(run)
end(run)
Size (TB)
D239317315104
5.709
ND2
1116
51056432
1.643
ND2-N2
5646434
7051
0.839
N2
607196
7262
0.072
Air
33
72637300
0.031
SC
45
7346
7405
0.056

Table 3: Runs by Muon Charge and Momentum

Muon ChargeMuon Momentum
Number of runs
start run
end run
TPC Gas
Size (TB)
mu-
-1.28
4441
731
7405
D2
6.441
mu+
+1.28
653
2417
7175
D20.969
mu-
-1.09
21
7201
7296
N2
0.025
mu-
-1.06
13
7210
7265
N2
0.014
mu-
-1.08
13
7219
7290
N2
0.013
mu-
-1.05
10
72457270
N2
0.011
mu-
-1.12
7
7240
7300
N2
0.007
mu-
-1.04
7
7251
7274
N2
0.009
mu-
-1.07
7
7215
7282
N2
0.008
mu-
-1.10
6
7232
7239
N2
0.006
mu-
-1.03
4
7275
7278
N2
0.004
mu-
-1.02
37255
7257
N2
0.003

Run1 Datasets

The runs from the first MuSun run is classified into different datasets. A sample data set name and how to read it is given in figure below.

All runs with quality 'Y' and ncsa_available=1 are selected and "PR" (=Production Run) name is given. These runs are then classified depending on muon beam and momentum scales. Then classification of the TPC gas, hv and magnet is applied (see elog). At last, subset of datasets were constructed depending on FADC and WFD settings (see elog).

Figure: How To Read Dataset Names.

How To Read MuSun Dataset Names

Major Datasets

Datasets are then sorted here by the size. All 58 datasets can be found in elog.

Table: Major Datasets

Run1 Elogs

Elogs About Documentation

Nov 3 17:09:34 2008:: The scheme of the MuSun DAQ for 2008 run. 12
Nov 4 11:31:52 2008:: Peter's photo gallery about run1. 13
Nov 9 12:54:15 2008:: MuCap Manual. 39
Nov 9 13:06:57 2008:: Useful elog entries from the past. ->
Nov 9 13:35:26 2008:: FADC Adress Settings. ->
Nov 10 09:14:05 2008: Run1 preparation from Peter K. ->
Nov 10 17:27:49 2008: MuSun Run schedule. ->
Nov 11 06:02:38 2008: Survey measurement report. ->
Nov 11 14:40:51 2008: TPC pads and cabling map. ->
Nov 13 07:44:18 2008: Relay scheme for gas alarms. ->
Nov 14 07:52:18 2008: CVS repository setup. ->
Nov 15 14:53:26 2008: HowTo for the event display. ->
Nov 16 00:21:35 2008: TPC respond on beam momentum change. ->
Nov 16 17:20:56 2008: TPC thresholds and triggers. ->
Nov 18 15:52:36 2008: FADC switch settings and some technical documents. ->
Nov 18 19:57:51 2008: Slow control parameters. ->
Nov 19 01:50:03 2008: How to cure TDC400 order errors. ->
Nov 19 04:47:38 2008: Parameters of Veto for neutron counter. ->
Nov 19 09:55:10 2008: Updated shift manual. ->
Nov 22 15:54:31 2008: Gondola voltage calibration guide by Justin. ->
Nov 23 18:38:48 2008: Sample pulses in TPC FADC. ->
Nov 24 08:58:26 2008: uSR magnet values. ->
Nov 24 14:12:26 2008: Chromotografy anaylsis plan. ->
Nov 27 08:01:50 2008: N2 doping proposal. ->
Nov 28 17:16:39 2008: WFD tests and TPC sector connection scheme to WFDs. ->
Dec 1 03:57:36 2008 : The position of the neutron and NaI detectors. ->
Dec 1 05:50:40 2008 : Preparation of Nitrogen doped deuterium mixture. ->
Dec 3 07:25:51 2008 : Preparation of gas samples for 50 ppm doped N2 run. ->
Dec 5 05:44:54 2008 : The quantity of deuterium inserted into CHUPS. ->
Dec 5 16:30:36 2008 : WFD map for TPC. ->
Dec 7 05:22:11 2008 : Impurity of the hydrogen in deuterium. ->
Dec 10 21:28:11 2008: Trigger files. ->
Dec 10 22:45:19 2008: Proposal of NaI detector calibration by baloon of N2. ->
Dec 13 16:57:12 2008: Check list. ->

Detector and Beam Changes During Run1

Nov 12 22:18:26 2008: WFD crate for TPC installed. ->
Nov 13 20:30:19 2008: First muon beam. ->
Nov 14 09:34:14 2008: EJ-309 neutron counter assembly. ->
Nov 15 08:09:46 2008: Neutron FADC installed. ->
Nov 16 19:16:35 2008: Start of production data taking. ->
Nov 18 13:06:08 2008: Neutron counter setup. ->
Nov 18 17:32:07 2008: Replacement of bad phototubes by Justin. ->
Nov 18 19:03:38 2008: TPC magnet installed by Bernhard. Slow controls set up. TPC HV set back to 26 kV. ->
Nov 18 23:43:02 2008: Veto for neutron counter is installed. ->
Nov 21 09:31:07 2008: Second neutron detector is installed. ->
Nov 22 23:49:14 2008: NaI installation and 22Na calibration runs. ->
Nov 23 21:39:35 2008: Setting up the new FADC for NaI detector. ->
Nov 24 08:47:47 2008: NaI setup. ->
Nov 24 10:29:37 2008: Veto for NaI is installed. Veto for neutron detector 1 was unmounted. ->
Nov 25 18:14:10 2008: Ge detector setup. ->
Nov 26 03:42:54 2008: TPC magnet is on after run 1630. (2008-11-24 15:51:13) ->
Nov 26 05:32:40 2008: TPC overpressure valve is installed. ->
Nov 27 04:59:57 2008: Switching to mu+ after run 2379. ->
Nov 27 14:21:50 2008: TPC magnet switched off at run 2457. ->
Dec 1 02:43:30 2008 : NaI and Ndet1 removed. ->
Dec 1 18:26:52 2008 : Ge detector is installed. NaI detector is removed and installed back about at the same place. ->
Dec 3 13:03:13 2008 : Ge detector died after run 3780. ->
Dec 7 09:49:59 2008 : 1.6 ppm N2 impurities injected into TPC starting run 5108. ->
Dec 11 03:15:32 2008: Switch to CHUPS cleaning off 50ppm N2 and mu+, starting run 6434. ->
Dec 12 08:09:26 2008: Balloon experiment setup. ->
Dec 12 10:27:25 2008: Switching to mu- at run 6799, did not work, switched back to mu+ at run 6804. ->
Dec 13 10:07:35 2008: MuLan tile installed to study the "Cherenkov" component, starting run 7060. ->
Dec 13 12:15:52 2008: Beam switched back to mu-, starting run 7070. Beam is now mu+ starting on run 7113. ->
Dec 13 16:57:12 2008: Final production run 7175. ->
Dec 16 05:27:44 2008: N2 balloon experiments starting run 7190, air experiments starting run 7263. ->
Dec 17 12:17:47 2008: NaI detector removed and thick muon counter installed. muSC/muPC efficiency study starts run 7346. ->

The Calibration and Analysis During Run1

Nov 13 08:37:49 2008: Laser Measurement. ->
Nov 16 07:50:47 2008: Energy and time resolutions of prototype TPC. ->
Nov 16 08:16:56 2008: Alpha source calibration. ->
Nov 16 08:45:21 2008: Basic Neutron analyzer. ->
Nov 16 15:26:54 2008: Na22 calibration runs. ->
Nov 17 02:46:36 2008: muPC beta source test. ->
Nov 17 03:13:19 2008: muPC beta source test, test pulser on three different amplifiers. ->
Nov 17 06:34:37 2008: Neutron counter gain studies. ->
Nov 18 04:05:40 2008: NaI Test runs. ->
Nov 19 10:41:09 2008: FADC calibration runs. ->
Nov 21 23:06:55 2008: Neutron detector Na22 calibration runs. ->
Nov 23 10:44:20 2008: TPC energy distribution runs with different EH. ->
Nov 23 22:06:55 2008: Basic NaI analyzer. ->
Nov 24 19:33:10 2008: Energy distributions of special runs. ->
Nov 26 00:58:09 2008: 241Am and 22Na calibration of NaI detector. ->
Nov 26 04:32:11 2008: Chromotograph analisis D2 from new TPC, ->
Nov 27 01:56:20 2008: NaI detector resolution tests. ->
Nov 27 09:52:31 2008: NaI tests without beam between runs 2280-2333. Back to mu- again after run 2475. ->
Nov 27 17:34:06 2008: NaI calibration with Am on place. ->
Nov 28 05:29:45 2008: Analysis D2 for preparation mixture D2 +N2. ->
Nov 28 17:16:39 2008: WFD tests and TPC sector connection scheme to WFDs. ->
Nov 29 10:58:32 2008: FADC and WFD calibration sector D, and WFD calibration sector E, D between runs 2929-2938. ->
Nov 29 14:37:51 2008: FADC calibration analysis. ->
Dec 1 01:28:18 2008 : Energy resolutions from special 1 meV pulses. ->
Dec 1 08:32:08 2008 : Alpha calibration attempt, runs between 3470-3745. ->
Dec 1 14:21:48 2008 : TPC charge/energy calibration. ->
Dec 1 19:27:20 2008 : Ge calibration with Am on situ. ->
Dec 2 07:29:51 2008 : Analysis D2 from TPC. ->
Dec 2 17:05:18 2008 : Alpha calib with beam TPC Sectors C and D, see MYSQL runs 3713-3732
Dec 7 02:25:48 2008 : Quick version of WFD display. ->
Dec 7 09:24:32 2008 : TPC Sector B and C calibration runs, starting run 5097 till 5104. ->
Dec 7 17:06:44 2008 : The drop in "muon lifetime" due to N2 doping. ->
Dec 9 05:04:39 2008 : Gas analysis D2+N2 run. ->
Dec 12 11:43:51 2008: Beam momentum calculations for N2 Balloon runs. ->
Dec 12 16:21:48 2008: Beam momentum calculations for N2 Balloon runs. ->
Dec 13 13:00:34 2008: Calibration of the amplifiers on the muon beam. ->
Dec 14 15:20:18 2008: Summary of the gas chromotographic analysis during MuSun Run1. ->
Dec 15 08:22:34 2008: Ndet2 calibration runs between 7176-7189 522][->]]
Dec 16 05:27:44 2008: N2 balloon experiments starting run 7190, air experiments starting run 7263. ->
Dec 18 03:07:27 2008: The quality of the muCS/muPC efficiency measurements before run 7432 is questionable. ->

Software and Parameter Changes During Run1

Nov 13 15:36:09 2008: TPC Elow thresholds. ->
Nov 16 07:00:19 2008: Basic parameters of new TPC. ->
Nov 17 18:18:00 2008: Changes in WFD Crate. ->
Nov 18 22:14:57 2008: FO-103-A module replaced in master logic NIM crate, which fanouts TDC400 signal. LB102 Master logic module replaced. ->
Nov 19 09:14:18 2008: TDC400 check is disabled. ->
Nov 19 17:54:29 2008: Neutron anticounter HV to 2000. master_2.jed loaded. FADC block signal not inverted. ->
Nov 20 09:40:38 2008: Separator voltage tunning. ->
Nov 20 15:45:03 2008: Error in kicker logic is recovered and corrected. ->
Nov 20 19:32:22 2008: New firmware uploaded into master logic unit LB102. ->
Nov 22 01:23:37 2008: Voltage Calibration Runs for gondolas. ->
Nov 23 10:20:11 2008: EH=35 and EH=30 runs (was EH=40). ->
Nov 23 11:55:27 2008: Delay of FADC gate reducted to 38us from 40us. ->
Nov 25 13:53:02 2008: New WFD 24NOV08 firmware. ->
Nov 25 17:04:05 2008: TPC sector E is now in woofters. ->
Nov 26 01:13:13 2008: TPC sector E is back in FADCs. it was used to test new WFD firmware between runs 2070-2099. ->
Nov 27 20:17:59 2008: WFD w/o Sector E in FADC tests between runs 2542-2567. ->
Nov 28 17:16:39 2008: TPC Sector E connected to WFD, Sector D with FADCs starting from 2691. ->
Nov 28 17:16:39 2008: TPC Sector D is also connected to WFD starting run 2842. ->
Nov 28 17:16:39 2008: TPC Sector D back to FADC starting run 2851. ->
Nov 28 17:16:39 2008: TPC Sector D again in WFDs starting run 2874. ->
Nov 29 12:55:30 2008: New amp Elow thresh = 350 starting run 2789, from MYSQL
Nov 29 02:24:23 2008: WFD tune: TPC sector E. ->
Nov 29 05:17:28 2008: New amplifier installed on sector B. ->
Nov 29 10:58:32 2008: muPC back at 2500 after run 2915. ->
Nov 30 04:09:45 2008: TPC Sector E connected back to FADC. TPC Sector C connected to WFD, starting run 3199. ->
Nov 30 04:09:45 2008: FADC boards 5-7 disabled, starting run 3221. ->
Dec 1 09:46:13 2008 : TPC pressure setpoint changed to 10.1 from 10.2. ->
Dec 2 03:12:08 2008 : TPC pressure decreased to 10 bar. ->
Dec 2 14:58:50 2008 : WFD clock frequency reduced from 100 MHz to 60 MHz. Some runs with 125 MHz. WFD DBC reduced from 15 to 10 (80 samples/block), starting run 3673. ->
Dec 2 17:05:51 2008 : WFD clock frequency 60 MHz, starting run 3705. ->
Dec 3 08:43:28 2008 : New 02DEC08 firmware release. ->
Dec 3 21:58:53 2008 : TPC threshold back to 30, between runs 3800-3861. ->
Dec 4 05:28:12 2008 : New amplifier (shaping time 400ns) installed in sector D. No mention on MYSQL database. My guess is starting somewhere between runs 3916-3960. ->
Dec 4 12:32:49 2008 : TPC Pressure back to 10.2 bar. ->
Dec 4 19:04:05 2008 : New FPGA firmware downloaded. ->
Dec 5 03:24:29 2008 : Data loss in some FADC boards around runs 4245. ->
Dec 5 14:48:15 2008 : Genna's new amplifier board is installed. ->
Dec 5 14:48:15 2008 : TPC Sector B in WFDs. ->
Dec 5 18:08:37 2008 : Bad WFD cable(s). ->
Dec 9 03:43:42 2008 : Missing TPC pad 57. ->
Dec 10 02:17:57 2008: Amplifier for TPC sector B has been removed, tested and reinstalled between runs 6100-6141. ->
Dec 10 03:55:37 2008: Full TPC readout with FADCs, WFDs no longer in use. ->
Dec 10 18:23:37 2008: Threshold change in NaI veto, NaI veto is now in WFDs. ->
Dec 10 21:48:01 2008: FADC trigger change between D2 and D2+N2, relevant runs 6700-6704. ->

>
>
Please go to https://muon.npl.washington.edu/twiki/bin/view/Main/MuSunRun1Summary
 \ No newline at end of file

Revision 102009-04-01 - SerdarKizilgul

Line: 1 to 1
 
META TOPICPARENT name="MuSunRun1Analysis"
-- SerdarKizilgul - 18 Mar 2009

Run1 Summary

Line: 11 to 11
  7217 runs (8.9 TB) were copied to the NPL and then copied to NCSA FTP server (mss.ncsa.uiuc.edu) in the directory /home/kizilgul/Runs1.
Changed:
<
<
The run log databes is on the MYSQL server, which can be reached from any NPL computers with npl ~> mysql -h mysql -u musun -p.
>
>
The run log database is on the MYSQL server, which can be reached from any NPL computers with npl ~> mysql -h mysql -u musun -p.
  Total 5183 runs (4532 mu-, 653 mu+) are marked as a good ('Y') quality production run.
Line: 29 to 29
  Table 1: Runs by Quality
Changed:
<
<
Quality Number of Runs
Size (TB)
Y (Good runs) 51857.511
T (Test or Calibration) 7420.518
N (Not Good)
8770.355
P (Problems) 290.022
K (Kicker problem)
3680.525
>
>
Quality Number of Runs
Size (TB)
Y (Good runs) 51837.511
T (Test or Calibration) 7420.518
N (Not Good)
8770.355
P (Problems) 290.022
K (Kicker problem)
3680.525
  Table 2: Runs by TPC Gas
Line: 52 to 52
  Datasets are then sorted here by the size. All 58 datasets can be found in elog.
Changed:
<
<
Table: Major Datasets
>
>
Table: Major Datasets
 

Revision 92009-03-26 - SerdarKizilgul

Line: 1 to 1
 
META TOPICPARENT name="MuSunRun1Analysis"
-- SerdarKizilgul - 18 Mar 2009

Run1 Summary

Line: 38 to 38
 Table 3: Runs by Muon Charge and Momentum

Muon ChargeMuon Momentum
Number of runs
start run
end run
TPC Gas
Size (TB)
mu-
-1.28
4441
731
7405
D2
6.441
mu+
+1.28
653
2417
7175
D20.969
mu-
-1.09
21
7201
7296
N2
0.025
mu-
-1.06
13
7210
7265
N2
0.014
mu-
-1.08
13
7219
7290
N2
0.013
mu-
-1.05
10
72457270
N2
0.011
mu-
-1.12
7
7240
7300
N2
0.007
mu-
-1.04
7
7251
7274
N2
0.009
mu-
-1.07
7
7215
7282
N2
0.008
mu-
-1.10
6
7232
7239
N2
0.006
mu-
-1.03
4
7275
7278
N2
0.004
mu-
-1.02
37255
7257
N2
0.003
Added:
>
>

Run1 Datasets

 
Changed:
<
<
coming up
>
>
The runs from the first MuSun run is classified into different datasets. A sample data set name and how to read it is given in figure below.

All runs with quality 'Y' and ncsa_available=1 are selected and "PR" (=Production Run) name is given. These runs are then classified depending on muon beam and momentum scales. Then classification of the TPC gas, hv and magnet is applied (see elog). At last, subset of datasets were constructed depending on FADC and WFD settings (see elog).

Figure: How To Read Dataset Names.

How To Read MuSun Dataset Names

Major Datasets

Datasets are then sorted here by the size. All 58 datasets can be found in elog.

Table: Major Datasets

 
Deleted:
<
<
coming up
 

Run1 Elogs

Elogs About Documentation

Revision 82009-03-23 - SerdarKizilgul

Line: 1 to 1
 
META TOPICPARENT name="MuSunRun1Analysis"
-- SerdarKizilgul - 18 Mar 2009

Run1 Summary

Line: 25 to 25
  The overview of the run1 is done by Peter K.
Changed:
<
<

ELOGS

>
>

Run1 Statistics

Table 1: Runs by Quality

Quality Number of Runs
Size (TB)
Y (Good runs) 51857.511
T (Test or Calibration) 7420.518
N (Not Good)
8770.355
P (Problems) 290.022
K (Kicker problem)
3680.525

Table 2: Runs by TPC Gas

TPC Gas
Number of runs
start(run)
end(run)
Size (TB)
D239317315104
5.709
ND2
1116
51056432
1.643
ND2-N2
5646434
7051
0.839
N2
607196
7262
0.072
Air
33
72637300
0.031
SC
45
7346
7405
0.056

Table 3: Runs by Muon Charge and Momentum

Muon ChargeMuon Momentum
Number of runs
start run
end run
TPC Gas
Size (TB)
mu-
-1.28
4441
731
7405
D2
6.441
mu+
+1.28
653
2417
7175
D20.969
mu-
-1.09
21
7201
7296
N2
0.025
mu-
-1.06
13
7210
7265
N2
0.014
mu-
-1.08
13
7219
7290
N2
0.013
mu-
-1.05
10
72457270
N2
0.011
mu-
-1.12
7
7240
7300
N2
0.007
mu-
-1.04
7
7251
7274
N2
0.009
mu-
-1.07
7
7215
7282
N2
0.008
mu-
-1.10
6
7232
7239
N2
0.006
mu-
-1.03
4
7275
7278
N2
0.004
mu-
-1.02
37255
7257
N2
0.003

coming up

coming up

Run1 Elogs

 

Elogs About Documentation

Nov 3 17:09:34 2008:: The scheme of the MuSun DAQ for 2008 run. 12
Nov 4 11:31:52 2008:: Peter's photo gallery about run1. 13
Nov 9 12:54:15 2008:: MuCap Manual. 39
Nov 9 13:06:57 2008:: Useful elog entries from the past. ->
Nov 9 13:35:26 2008:: FADC Adress Settings. ->
Nov 10 09:14:05 2008: Run1 preparation from Peter K. ->
Nov 10 17:27:49 2008: MuSun Run schedule. ->
Nov 11 06:02:38 2008: Survey measurement report. ->
Nov 11 14:40:51 2008: TPC pads and cabling map. ->
Nov 13 07:44:18 2008: Relay scheme for gas alarms. ->
Nov 14 07:52:18 2008: CVS repository setup. ->
Nov 15 14:53:26 2008: HowTo for the event display. ->
Nov 16 00:21:35 2008: TPC respond on beam momentum change. ->
Nov 16 17:20:56 2008: TPC thresholds and triggers. ->
Nov 18 15:52:36 2008: FADC switch settings and some technical documents. ->
Nov 18 19:57:51 2008: Slow control parameters. ->
Nov 19 01:50:03 2008: How to cure TDC400 order errors. ->
Nov 19 04:47:38 2008: Parameters of Veto for neutron counter. ->
Nov 19 09:55:10 2008: Updated shift manual. ->
Nov 22 15:54:31 2008: Gondola voltage calibration guide by Justin. ->
Nov 23 18:38:48 2008: Sample pulses in TPC FADC. ->
Nov 24 08:58:26 2008: uSR magnet values. ->
Nov 24 14:12:26 2008: Chromotografy anaylsis plan. ->
Nov 27 08:01:50 2008: N2 doping proposal. ->
Nov 28 17:16:39 2008: WFD tests and TPC sector connection scheme to WFDs. ->
Dec 1 03:57:36 2008 : The position of the neutron and NaI detectors. ->
Dec 1 05:50:40 2008 : Preparation of Nitrogen doped deuterium mixture. ->
Dec 3 07:25:51 2008 : Preparation of gas samples for 50 ppm doped N2 run. ->
Dec 5 05:44:54 2008 : The quantity of deuterium inserted into CHUPS. ->
Dec 5 16:30:36 2008 : WFD map for TPC. ->
Dec 7 05:22:11 2008 : Impurity of the hydrogen in deuterium. ->
Dec 10 21:28:11 2008: Trigger files. ->
Dec 10 22:45:19 2008: Proposal of NaI detector calibration by baloon of N2. ->
Dec 13 16:57:12 2008: Check list. ->

Revision 72009-03-23 - SerdarKizilgul

Line: 1 to 1
 
META TOPICPARENT name="MuSunRun1Analysis"
-- SerdarKizilgul - 18 Mar 2009
Changed:
<
<

MuSun Run1 Summary

>
>

Run1 Summary

  The first MuSun musun run was started Nov. 3rd and completed Dec. 18th of 2008 at PSI, Switzerland.
Changed:
<
<
Total 7405 runs were collected during one month of actual run period. 5183 of these runs (4532 mu-, 653 mu+) are marked as a good quality production run and takes 7.5 TB disk space ftp server NCSA (mss.ncsa.uiuc.edu).
>
>
Total 7405 runs were collected during one month of actual run period.
 
Changed:
<
<
During the runs, logs are recorded online to run1 elogs and summarized for data classification.
>
>
One copy of the 71 tapes are in room 428 Loomis Lab, Illinois.
 
Changed:
<
<
The mysql database has been updated according to elogs.
>
>
7217 runs (8.9 TB) were copied to the NPL and then copied to NCSA FTP server (mss.ncsa.uiuc.edu) in the directory /home/kizilgul/Runs1.

The run log databes is on the MYSQL server, which can be reached from any NPL computers with npl ~> mysql -h mysql -u musun -p.

Total 5183 runs (4532 mu-, 653 mu+) are marked as a good ('Y') quality production run.

The 'Y' quality runs take 7.5 TB disk space

During the runs, logs are recorded online to run1 elogs.

The summary of the elogs created for data classification.

Before the data classification, the mysql database has been updated according to elogs.

  The overview of the run1 is done by Peter K.
Changed:
<
<

Elogs About Documentation

>
>

ELOGS

Elogs About Documentation

  Nov 3 17:09:34 2008:: The scheme of the MuSun DAQ for 2008 run. 12
Nov 4 11:31:52 2008:: Peter's photo gallery about run1. 13
Nov 9 12:54:15 2008:: MuCap Manual. 39
Nov 9 13:06:57 2008:: Useful elog entries from the past. ->
Nov 9 13:35:26 2008:: FADC Adress Settings. ->
Nov 10 09:14:05 2008: Run1 preparation from Peter K. ->
Nov 10 17:27:49 2008: MuSun Run schedule. ->
Nov 11 06:02:38 2008: Survey measurement report. ->
Nov 11 14:40:51 2008: TPC pads and cabling map. ->
Nov 13 07:44:18 2008: Relay scheme for gas alarms. ->
Nov 14 07:52:18 2008: CVS repository setup. ->
Nov 15 14:53:26 2008: HowTo for the event display. ->
Nov 16 00:21:35 2008: TPC respond on beam momentum change. ->
Nov 16 17:20:56 2008: TPC thresholds and triggers. ->
Nov 18 15:52:36 2008: FADC switch settings and some technical documents. ->
Nov 18 19:57:51 2008: Slow control parameters. ->
Nov 19 01:50:03 2008: How to cure TDC400 order errors. ->
Nov 19 04:47:38 2008: Parameters of Veto for neutron counter. ->
Nov 19 09:55:10 2008: Updated shift manual. ->
Nov 22 15:54:31 2008: Gondola voltage calibration guide by Justin. ->
Nov 23 18:38:48 2008: Sample pulses in TPC FADC. ->
Nov 24 08:58:26 2008: uSR magnet values. ->
Nov 24 14:12:26 2008: Chromotografy anaylsis plan. ->
Nov 27 08:01:50 2008: N2 doping proposal. ->
Nov 28 17:16:39 2008: WFD tests and TPC sector connection scheme to WFDs. ->
Dec 1 03:57:36 2008 : The position of the neutron and NaI detectors. ->
Dec 1 05:50:40 2008 : Preparation of Nitrogen doped deuterium mixture. ->
Dec 3 07:25:51 2008 : Preparation of gas samples for 50 ppm doped N2 run. ->
Dec 5 05:44:54 2008 : The quantity of deuterium inserted into CHUPS. ->
Dec 5 16:30:36 2008 : WFD map for TPC. ->
Dec 7 05:22:11 2008 : Impurity of the hydrogen in deuterium. ->
Dec 10 21:28:11 2008: Trigger files. ->
Dec 10 22:45:19 2008: Proposal of NaI detector calibration by baloon of N2. ->
Dec 13 16:57:12 2008: Check list. ->
Changed:
<
<

Detector and Beam Changes During Run1

>
>

Detector and Beam Changes During Run1

 
Changed:
<
<
Nov 12 22:18:26 2008: WFD crate for TPC installed. ->
Nov 13 20:30:19 2008: First muon beam. ->
Nov 14 09:34:14 2008: EJ-309 neutron counter assembly. ->
Nov 15 08:09:46 2008: Neutron FADC installed. ->
Nov 16 19:16:35 2008: Start of production data taking. ->
Nov 18 13:06:08 2008: Neutron counter setup. ->
Nov 18 17:32:07 2008: Replacement of bad phototubes by Justin. ->
Nov 18 19:03:38 2008: TPC Magnet installed by Bernhard. Slow controls set up. TPC HV set back to 26 kV. ->
Nov 18 23:43:02 2008: Veto for neutron counter is installed. ->
Nov 21 09:31:07 2008: Second neutron detector is installed. ->
Nov 22 23:49:14 2008: NaI installation and 22Na calibration runs. ->
Nov 23 21:39:35 2008: Setting up the new FADC for NaI detector. ->
Nov 24 08:47:47 2008: NaI Setup. ->
Nov 24 10:29:37 2008: Veto for NaI is installed. Veto for neutron detector 1 was unmounted. ->
Nov 25 18:14:10 2008: Ge detector setup. ->
Nov 26 03:42:54 2008: TPC magnet is on after run 1630. (2008-11-24 15:51:13) ->
Nov 26 05:32:40 2008: TPC overpressure valve is installed. ->
Nov 27 04:59:57 2008: Switching to mu+ after run 2379. ->
Nov 27 14:21:50 2008: TPC muSR magnet switched off at run 2457. ->
Dec 1 02:43:30 2008 : NaI and Ndet1 removed. ->
Dec 1 18:26:52 2008 : Ge detector is installed. NaI detector is removed and installed back about at the same place. ->
Dec 3 13:03:13 2008 : Ge detector died after run 3780. ->
Dec 7 09:49:59 2008 : 1.6 ppm N_2 impurities injected into TPC starting run 5108. ->
Dec 11 03:15:32 2008: Switch to CHUPS cleaning off 50ppm N2 and mu+, starting run 6434. ->
Dec 12 08:09:26 2008: Balloon experiment setup. ->
Dec 12 10:27:25 2008: Switching to mu- at run 6799, did not work, switched back to mu+ at run 6804. ->
Dec 13 10:07:35 2008: MuLan tile installed to study the "Cherenkov" component, starting run 7060. ->
Dec 13 12:15:52 2008: Beam switched back to mu-, starting run 7070. Beam is now mu+ starting on run 7113. ->
Dec 13 16:57:12 2008: Final run 7175. ->
Dec 16 05:27:44 2008: N2 balloon experiments starting run 7190, air experiments starting run 7263. ->
Dec 17 12:17:47 2008: NaI detector removed and thick muon counter installed. muSC/muPC efficiency study starts run 7346. ->

The Calibration and Analysis During Run1

>
>
Nov 12 22:18:26 2008: WFD crate for TPC installed. ->
Nov 13 20:30:19 2008: First muon beam. ->
Nov 14 09:34:14 2008: EJ-309 neutron counter assembly. ->
Nov 15 08:09:46 2008: Neutron FADC installed. ->
Nov 16 19:16:35 2008: Start of production data taking. ->
Nov 18 13:06:08 2008: Neutron counter setup. ->
Nov 18 17:32:07 2008: Replacement of bad phototubes by Justin. ->
Nov 18 19:03:38 2008: TPC magnet installed by Bernhard. Slow controls set up. TPC HV set back to 26 kV. ->
Nov 18 23:43:02 2008: Veto for neutron counter is installed. ->
Nov 21 09:31:07 2008: Second neutron detector is installed. ->
Nov 22 23:49:14 2008: NaI installation and 22Na calibration runs. ->
Nov 23 21:39:35 2008: Setting up the new FADC for NaI detector. ->
Nov 24 08:47:47 2008: NaI setup. ->
Nov 24 10:29:37 2008: Veto for NaI is installed. Veto for neutron detector 1 was unmounted. ->
Nov 25 18:14:10 2008: Ge detector setup. ->
Nov 26 03:42:54 2008: TPC magnet is on after run 1630. (2008-11-24 15:51:13) ->
Nov 26 05:32:40 2008: TPC overpressure valve is installed. ->
Nov 27 04:59:57 2008: Switching to mu+ after run 2379. ->
Nov 27 14:21:50 2008: TPC magnet switched off at run 2457. ->
Dec 1 02:43:30 2008 : NaI and Ndet1 removed. ->
Dec 1 18:26:52 2008 : Ge detector is installed. NaI detector is removed and installed back about at the same place. ->
Dec 3 13:03:13 2008 : Ge detector died after run 3780. ->
Dec 7 09:49:59 2008 : 1.6 ppm N2 impurities injected into TPC starting run 5108. ->
Dec 11 03:15:32 2008: Switch to CHUPS cleaning off 50ppm N2 and mu+, starting run 6434. ->
Dec 12 08:09:26 2008: Balloon experiment setup. ->
Dec 12 10:27:25 2008: Switching to mu- at run 6799, did not work, switched back to mu+ at run 6804. ->
Dec 13 10:07:35 2008: MuLan tile installed to study the "Cherenkov" component, starting run 7060. ->
Dec 13 12:15:52 2008: Beam switched back to mu-, starting run 7070. Beam is now mu+ starting on run 7113. ->
Dec 13 16:57:12 2008: Final production run 7175. ->
Dec 16 05:27:44 2008: N2 balloon experiments starting run 7190, air experiments starting run 7263. ->
Dec 17 12:17:47 2008: NaI detector removed and thick muon counter installed. muSC/muPC efficiency study starts run 7346. ->

The Calibration and Analysis During Run1

  Nov 13 08:37:49 2008: Laser Measurement. ->
Nov 16 07:50:47 2008: Energy and time resolutions of prototype TPC. ->
Nov 16 08:16:56 2008: Alpha source calibration. ->
Nov 16 08:45:21 2008: Basic Neutron analyzer. ->
Nov 16 15:26:54 2008: Na22 calibration runs. ->
Nov 17 02:46:36 2008: muPC beta source test. ->
Nov 17 03:13:19 2008: muPC beta source test, test pulser on three different amplifiers. ->
Nov 17 06:34:37 2008: Neutron counter gain studies. ->
Nov 18 04:05:40 2008: NaI Test runs. ->
Nov 19 10:41:09 2008: FADC calibration runs. ->
Nov 21 23:06:55 2008: Neutron detector Na22 calibration runs. ->
Nov 23 10:44:20 2008: TPC energy distribution runs with different EH. ->
Nov 23 22:06:55 2008: Basic NaI analyzer. ->
Nov 24 19:33:10 2008: Energy distributions of special runs. ->
Nov 26 00:58:09 2008: 241Am and 22Na calibration of NaI detector. ->
Nov 26 04:32:11 2008: Chromotograph analisis D2 from new TPC, ->
Nov 27 01:56:20 2008: NaI detector resolution tests. ->
Nov 27 09:52:31 2008: NaI tests without beam between runs 2280-2333. Back to mu- again after run 2475. ->
Nov 27 17:34:06 2008: NaI calibration with Am on place. ->
Nov 28 05:29:45 2008: Analysis D2 for preparation mixture D2 +N2. ->
Nov 28 17:16:39 2008: WFD tests and TPC sector connection scheme to WFDs. ->
Nov 29 10:58:32 2008: FADC and WFD calibration sector D, and WFD calibration sector E, D between runs 2929-2938. ->
Nov 29 14:37:51 2008: FADC calibration analysis. ->
Dec 1 01:28:18 2008 : Energy resolutions from special 1 meV pulses. ->
Dec 1 08:32:08 2008 : Alpha calibration attempt, runs between 3470-3745. ->
Dec 1 14:21:48 2008 : TPC charge/energy calibration. ->
Dec 1 19:27:20 2008 : Ge calibration with Am on situ. ->
Dec 2 07:29:51 2008 : Analysis D2 from TPC. ->
Dec 2 17:05:18 2008 : Alpha calib with beam TPC Sectors C and D, see MYSQL runs 3713-3732
Dec 7 02:25:48 2008 : Quick version of WFD display. ->
Dec 7 09:24:32 2008 : TPC Sector B and C calibration runs, starting run 5097 till 5104. ->
Dec 7 17:06:44 2008 : The drop in "muon lifetime" due to N2 doping. ->
Dec 9 05:04:39 2008 : Gas analysis D2+N2 run. ->
Dec 12 11:43:51 2008: Beam momentum calculations for N2 Balloon runs. ->
Dec 12 16:21:48 2008: Beam momentum calculations for N2 Balloon runs. ->
Dec 13 13:00:34 2008: Calibration of the amplifiers on the muon beam. ->
Dec 14 15:20:18 2008: Summary of the gas chromotographic analysis during MuSun Run1. ->
Dec 15 08:22:34 2008: Ndet2 calibration runs between 7176-7189 522][->]]
Dec 16 05:27:44 2008: N2 balloon experiments starting run 7190, air experiments starting run 7263. ->
Dec 18 03:07:27 2008: The quality of the muCS/muPC efficiency measurements before run 7432 is questionable. ->
Changed:
<
<

Software and Parameter Changes During Run1

>
>

Software and Parameter Changes During Run1

 
Changed:
<
<
Nov 13 15:36:09 2008: TPC Elow thresholds. ->
Nov 16 07:00:19 2008: Basic parameters of new TPC. ->
Nov 17 18:18:00 2008: Changes in WFD Crate. ->
Nov 18 22:14:57 2008: FO-103-A module replaced in master logic NIM crate, which fanouts TDC400 signal. LB102 Master logic module replaced. ->
Nov 19 09:14:18 2008: TDC400 check is disabled. ->
Nov 19 17:54:29 2008: Neutron anticounter HV to 2000. master_2.jed loaded. FADC block signal not inverted. ->
Nov 20 09:40:38 2008: Separator voltage tunning. ->
Nov 20 15:45:03 2008: Error in kicker logic is recovered and corrected. ->
Nov 20 19:32:22 2008: New firmware uploaded into master logic unit LB102. ->
Nov 22 01:23:37 2008: Voltage Calibration Runs for gondolas. ->
Nov 23 10:20:11 2008: EH=35 and EH=30 runs (was EH=40). ->
Nov 23 11:55:27 2008: Delay of FADC gate reducted to 38us from 40us. ->
Nov 25 13:53:02 2008: New WFD 24NOV08 firmware. ->
Nov 25 17:04:05 2008: TPC sector E is now in woofters. ->
Nov 26 01:13:13 2008: TPC sector E is back in FADCs. it was used to test new WFD firmware between runs 2070-2099. ->
Nov 27 20:17:59 2008: WFD w/o Sector E in FADC tests between runs 2542-2567. ->
Nov 28 17:16:39 2008: TPC Sector E connected to WFD, Sector D with FADCs starting from 2691. ->
Nov 28 17:16:39 2008: TPC Sector D is also connected to WFD starting run 2842. ->
Nov 28 17:16:39 2008: TPC Sector D back to FADC starting run 2851. ->
Nov 28 17:16:39 2008: TPC Sector D again in WFDs starting run 2874. ->
Nov 29 12:55:30 2008: New amp Elow thresh = 350 starting run 2789, from MYSQL
Nov 29 02:24:23 2008: WFD tune: TPC sector E. ->
Nov 29 05:17:28 2008: New amplifier installed on sector B. ->
Nov 29 10:58:32 2008: muPC back at 2500 after run 2915. ->
Nov 30 04:09:45 2008: TPC Sector E connected back to FADC. TPC Sector C connected to WFD, starting run 3199. ->
Nov 30 04:09:45 2008: FADC boards 5-7 disabled, starting run 3221. ->
Dec 1 09:46:13 2008 : TPC pressure setpoint changed to 10.1 from 10.2. ->
Dec 2 03:12:08 2008 : TPC pressure decreased to 10 bar. ->
Dec 2 14:58:50 2008 : WFD clock frequency reduced from 100 MHz to 60 MHz. Some runs with 125 MHz. WFD DBC reduced from 15 to 10 (80 samples/block), starting run 3673. ->
Dec 2 17:05:51 2008 : WFD clock frequency 60 MHz, starting run 3705. ->
Dec 3 08:43:28 2008 : New 02DEC08 firmware release. ->
Dec 3 21:58:53 2008 : TPC threshold back to 30, between runs 3800-3861. ->
Dec 4 05:28:12 2008 : New amplifier (shaping time 400ns) installed in sector D. No mention on MYSQL database. My guess is starting somewhere between runs 3916-3960. ->
Dec 4 12:32:49 2008 : TPC Pressure back to 10.2 bar. ->
Dec 4 19:04:05 2008 : New FPGA firmware downloaded. ->
Dec 5 03:24:29 2008 : Data loss in some FADC boards around runs 4245. ->
Dec 5 14:48:15 2008 : Genna's new amplifier board is installed. ->
Dec 5 14:48:15 2008 : TPC Sector B in WFDs. ->
Dec 5 18:08:37 2008 : Bad WFD cable(s). ->
Dec 9 03:43:42 2008 : Missing TPC pad 57. ->
Dec 10 02:17:57 2008: Amplifier for TPC sector B has been removed, tested and reinstalled between runs 6100-6141. ->
Dec 10 03:55:37 2008: Full TPC readout with FADCs, WFDs no longer in use. ->
Dec 10 18:23:37 2008: Threshold change in NaI veto, NaI veto is now in WFDs. ->
Dec 10 21:48:01 2008: FADC trigger change beween D2 and D2+N2, relevant runs 6700-6704. ->
>
>
Nov 13 15:36:09 2008: TPC Elow thresholds. ->
Nov 16 07:00:19 2008: Basic parameters of new TPC. ->
Nov 17 18:18:00 2008: Changes in WFD Crate. ->
Nov 18 22:14:57 2008: FO-103-A module replaced in master logic NIM crate, which fanouts TDC400 signal. LB102 Master logic module replaced. ->
Nov 19 09:14:18 2008: TDC400 check is disabled. ->
Nov 19 17:54:29 2008: Neutron anticounter HV to 2000. master_2.jed loaded. FADC block signal not inverted. ->
Nov 20 09:40:38 2008: Separator voltage tunning. ->
Nov 20 15:45:03 2008: Error in kicker logic is recovered and corrected. ->
Nov 20 19:32:22 2008: New firmware uploaded into master logic unit LB102. ->
Nov 22 01:23:37 2008: Voltage Calibration Runs for gondolas. ->
Nov 23 10:20:11 2008: EH=35 and EH=30 runs (was EH=40). ->
Nov 23 11:55:27 2008: Delay of FADC gate reducted to 38us from 40us. ->
Nov 25 13:53:02 2008: New WFD 24NOV08 firmware. ->
Nov 25 17:04:05 2008: TPC sector E is now in woofters. ->
Nov 26 01:13:13 2008: TPC sector E is back in FADCs. it was used to test new WFD firmware between runs 2070-2099. ->
Nov 27 20:17:59 2008: WFD w/o Sector E in FADC tests between runs 2542-2567. ->
Nov 28 17:16:39 2008: TPC Sector E connected to WFD, Sector D with FADCs starting from 2691. ->
Nov 28 17:16:39 2008: TPC Sector D is also connected to WFD starting run 2842. ->
Nov 28 17:16:39 2008: TPC Sector D back to FADC starting run 2851. ->
Nov 28 17:16:39 2008: TPC Sector D again in WFDs starting run 2874. ->
Nov 29 12:55:30 2008: New amp Elow thresh = 350 starting run 2789, from MYSQL
Nov 29 02:24:23 2008: WFD tune: TPC sector E. ->
Nov 29 05:17:28 2008: New amplifier installed on sector B. ->
Nov 29 10:58:32 2008: muPC back at 2500 after run 2915. ->
Nov 30 04:09:45 2008: TPC Sector E connected back to FADC. TPC Sector C connected to WFD, starting run 3199. ->
Nov 30 04:09:45 2008: FADC boards 5-7 disabled, starting run 3221. ->
Dec 1 09:46:13 2008 : TPC pressure setpoint changed to 10.1 from 10.2. ->
Dec 2 03:12:08 2008 : TPC pressure decreased to 10 bar. ->
Dec 2 14:58:50 2008 : WFD clock frequency reduced from 100 MHz to 60 MHz. Some runs with 125 MHz. WFD DBC reduced from 15 to 10 (80 samples/block), starting run 3673. ->
Dec 2 17:05:51 2008 : WFD clock frequency 60 MHz, starting run 3705. ->
Dec 3 08:43:28 2008 : New 02DEC08 firmware release. ->
Dec 3 21:58:53 2008 : TPC threshold back to 30, between runs 3800-3861. ->
Dec 4 05:28:12 2008 : New amplifier (shaping time 400ns) installed in sector D. No mention on MYSQL database. My guess is starting somewhere between runs 3916-3960. ->
Dec 4 12:32:49 2008 : TPC Pressure back to 10.2 bar. ->
Dec 4 19:04:05 2008 : New FPGA firmware downloaded. ->
Dec 5 03:24:29 2008 : Data loss in some FADC boards around runs 4245. ->
Dec 5 14:48:15 2008 : Genna's new amplifier board is installed. ->
Dec 5 14:48:15 2008 : TPC Sector B in WFDs. ->
Dec 5 18:08:37 2008 : Bad WFD cable(s). ->
Dec 9 03:43:42 2008 : Missing TPC pad 57. ->
Dec 10 02:17:57 2008: Amplifier for TPC sector B has been removed, tested and reinstalled between runs 6100-6141. ->
Dec 10 03:55:37 2008: Full TPC readout with FADCs, WFDs no longer in use. ->
Dec 10 18:23:37 2008: Threshold change in NaI veto, NaI veto is now in WFDs. ->
Dec 10 21:48:01 2008: FADC trigger change between D2 and D2+N2, relevant runs 6700-6704. ->

Revision 62009-03-20 - SerdarKizilgul

Line: 1 to 1
 
META TOPICPARENT name="MuSunRun1Analysis"
-- SerdarKizilgul - 18 Mar 2009

MuSun Run1 Summary

Line: 14 to 14
 The overview of the run1 is done by Peter K.

Elogs About Documentation

Changed:
<
<
Nov 3 17:09:34 2008:: The scheme of the MuSun DAQ for 2008 run. http://www.npl.illinois.edu/elog/musun/run1/12
Nov 4 11:31:52 2008:: Peter's photo gallery about run1. http://www.npl.illinois.edu/elog/musun/run1/13
Nov 9 12:54:15 2008:: MuCap Manual. http://www.npl.illinois.edu/elog/musun/run1/39
Nov 9 13:06:57 2008:: Useful elog entries from the past. http://www.npl.illinois.edu/elog/musun/run1/40
Nov 9 13:35:26 2008:: FADC Adress Settings. http://www.npl.illinois.edu/elog/musun/run1/43
Nov 10 09:14:05 2008: Run1 preparation from Peter K. http://www.npl.illinois.edu/elog/musun/run1/52
Nov 10 17:27:49 2008: MuSun Run schedule. http://www.npl.illinois.edu/elog/musun/run1/55
Nov 11 06:02:38 2008: Survey measurement report. http://www.npl.illinois.edu/elog/musun/run1/62
Nov 11 14:40:51 2008: TPC pads and cabling map. http://www.npl.illinois.edu/elog/musun/run1/70
Nov 13 07:44:18 2008: Relay scheme for gas alarms. http://www.npl.illinois.edu/elog/musun/run1/87
Nov 14 07:52:18 2008: CVS repository setup. http://www.npl.illinois.edu/elog/musun/run1/100
Nov 15 14:53:26 2008: HowTo for the event display. http://www.npl.illinois.edu/elog/musun/run1/116
Nov 16 00:21:35 2008: TPC respond on beam momentum change. http://www.npl.illinois.edu/elog/musun/run1/118
Nov 16 17:20:56 2008: TPC thresholds and triggers. http://www.npl.illinois.edu/elog/musun/run1/130
Nov 18 15:52:36 2008: FADC switch settings and some technical documents. http://www.npl.illinois.edu/elog/musun/run1/175
Nov 18 19:57:51 2008: Slow control parameters. http://www.npl.illinois.edu/elog/musun/run1/178
Nov 19 01:50:03 2008: How to cure TDC400 order errors. http://www.npl.illinois.edu/elog/musun/run1/182
Nov 19 04:47:38 2008: Parameters of Veto for neutron counter. http://www.npl.illinois.edu/elog/musun/run1/186
Nov 19 09:55:10 2008: Updated shift manual. http://www.npl.illinois.edu/elog/musun/run1/190
Nov 22 15:54:31 2008: Gondola voltage calibration guide by Justin. http://www.npl.illinois.edu/elog/musun/run1/239
Nov 23 18:38:48 2008: Sample pulses in TPC FADC. http://www.npl.illinois.edu/elog/musun/run1/254
Nov 24 08:58:26 2008: uSR magnet values. http://www.npl.illinois.edu/elog/musun/run1/265
Nov 24 14:12:26 2008: Chromotografy anaylsis plan. http://www.npl.illinois.edu/elog/musun/run1/272
Nov 27 08:01:50 2008: N2 doping proposal. http://www.npl.illinois.edu/elog/musun/run1/315
Nov 28 17:16:39 2008: WFD tests and TPC sector connection scheme to WFDs. http://www.npl.illinois.edu/elog/musun/run1/335
Dec 1 03:57:36 2008 : The position of the neutron and NaI detectors. http://www.npl.illinois.edu/elog/musun/run1/357
Dec 1 05:50:40 2008 : Preparation of Nitrogen doped deuterium mixture. http://www.npl.illinois.edu/elog/musun/run1/360
Dec 3 07:25:51 2008 : Preparation of gas samples for 50 ppm doped N2 run. http://www.npl.illinois.edu/elog/musun/run1/394
Dec 5 05:44:54 2008 : The quantity of deuterium inserted into CHUPS. http://www.npl.illinois.edu/elog/musun/run1/421
Dec 5 16:30:36 2008 : WFD map for TPC. http://www.npl.illinois.edu/elog/musun/run1/426
Dec 7 05:22:11 2008 : Impurity of the hydrogen in deuterium. http://www.npl.illinois.edu/elog/musun/run1/440
Dec 10 21:28:11 2008: Trigger files. http://www.npl.illinois.edu/elog/musun/run1/483
Dec 10 22:45:19 2008: Proposal of NaI detector calibration by baloon of N2. http://www.npl.illinois.edu/elog/musun/run1/485
Dec 13 16:57:12 2008: Check list. http://www.npl.illinois.edu/elog/musun/run1/512
>
>
Nov 3 17:09:34 2008:: The scheme of the MuSun DAQ for 2008 run. 12
Nov 4 11:31:52 2008:: Peter's photo gallery about run1. 13
Nov 9 12:54:15 2008:: MuCap Manual. 39
Nov 9 13:06:57 2008:: Useful elog entries from the past. ->
Nov 9 13:35:26 2008:: FADC Adress Settings. ->
Nov 10 09:14:05 2008: Run1 preparation from Peter K. ->
Nov 10 17:27:49 2008: MuSun Run schedule. ->
Nov 11 06:02:38 2008: Survey measurement report. ->
Nov 11 14:40:51 2008: TPC pads and cabling map. ->
Nov 13 07:44:18 2008: Relay scheme for gas alarms. ->
Nov 14 07:52:18 2008: CVS repository setup. ->
Nov 15 14:53:26 2008: HowTo for the event display. ->
Nov 16 00:21:35 2008: TPC respond on beam momentum change. ->
Nov 16 17:20:56 2008: TPC thresholds and triggers. ->
Nov 18 15:52:36 2008: FADC switch settings and some technical documents. ->
Nov 18 19:57:51 2008: Slow control parameters. ->
Nov 19 01:50:03 2008: How to cure TDC400 order errors. ->
Nov 19 04:47:38 2008: Parameters of Veto for neutron counter. ->
Nov 19 09:55:10 2008: Updated shift manual. ->
Nov 22 15:54:31 2008: Gondola voltage calibration guide by Justin. ->
Nov 23 18:38:48 2008: Sample pulses in TPC FADC. ->
Nov 24 08:58:26 2008: uSR magnet values. ->
Nov 24 14:12:26 2008: Chromotografy anaylsis plan. ->
Nov 27 08:01:50 2008: N2 doping proposal. ->
Nov 28 17:16:39 2008: WFD tests and TPC sector connection scheme to WFDs. ->
Dec 1 03:57:36 2008 : The position of the neutron and NaI detectors. ->
Dec 1 05:50:40 2008 : Preparation of Nitrogen doped deuterium mixture. ->
Dec 3 07:25:51 2008 : Preparation of gas samples for 50 ppm doped N2 run. ->
Dec 5 05:44:54 2008 : The quantity of deuterium inserted into CHUPS. ->
Dec 5 16:30:36 2008 : WFD map for TPC. ->
Dec 7 05:22:11 2008 : Impurity of the hydrogen in deuterium. ->
Dec 10 21:28:11 2008: Trigger files. ->
Dec 10 22:45:19 2008: Proposal of NaI detector calibration by baloon of N2. ->
Dec 13 16:57:12 2008: Check list. ->
 

Detector and Beam Changes During Run1

Changed:
<
<
Nov 12 22:18:26 2008: WFD crate for TPC installed. http://www.npl.illinois.edu/elog/musun/run1/78
Nov 13 20:30:19 2008: First muon beam. http://www.npl.illinois.edu/elog/musun/run1/95
Nov 14 09:34:14 2008: EJ-309 neutron counter assembly. http://www.npl.illinois.edu/elog/musun/run1/104
Nov 15 08:09:46 2008: Neutron FADC installed. http://www.npl.illinois.edu/elog/musun/run1/110
Nov 16 19:16:35 2008: Start of production data taking. http://www.npl.illinois.edu/elog/musun/run1/133
Nov 18 13:06:08 2008: Neutron counter setup: http://www.npl.illinois.edu/elog/musun/run1/174
Nov 18 17:32:07 2008: Replacement of bad phototubes by Justin. http://www.npl.illinois.edu/elog/musun/run1/176
Nov 18 19:03:38 2008: TPC Magnet installed by Bernhard. Slow controls set up. TPC HV set back to 26 kV. http://www.npl.illinois.edu/elog/musun/run1/177
Nov 18 23:43:02 2008: Veto for neutron counter is installed. http://www.npl.illinois.edu/elog/musun/run1/180
Nov 21 09:31:07 2008: Second neutron detector is installed. http://www.npl.illinois.edu/elog/musun/run1/224
Nov 22 23:49:14 2008: NaI installation and 22Na calibration runs. http://www.npl.illinois.edu/elog/musun/run1/243
Nov 23 21:39:35 2008: Setting up the new FADC for NaI detector. http://www.npl.illinois.edu/elog/musun/run1/255
Nov 24 08:47:47 2008: NaI Setup. http://www.npl.illinois.edu/elog/musun/run1/264
Nov 24 10:29:37 2008: Veto for NaI is installed. Veto for neutron detector 1 was unmounted. http://www.npl.illinois.edu/elog/musun/run1/271
Nov 25 18:14:10 2008: Ge detector setup. http://www.npl.illinois.edu/elog/musun/run1/289
Nov 26 03:42:54 2008: TPC magnet is on after run 1630. (2008-11-24 15:51:13) http://www.npl.illinois.edu/elog/musun/run1/296
Nov 26 05:32:40 2008: TPC overpressure valve is installed. http://www.npl.illinois.edu/elog/musun/run1/299
Nov 27 04:59:57 2008: Switching to mu+ after run 2379. http://www.npl.illinois.edu/elog/musun/run1/312
Nov 27 14:21:50 2008: TPC muSR magnet switched off at run 2457. http://www.npl.illinois.edu/elog/musun/run1/320
Dec 1 02:43:30 2008 : NaI and Ndet1 removed. http://www.npl.illinois.edu/elog/musun/run1/356
Dec 1 18:26:52 2008 : Ge detector is installed. NaI detector is removed and installed back about at the same place. http://www.npl.illinois.edu/elog/musun/run1/369
Dec 3 13:03:13 2008 : Ge detector died after run 3780. http://www.npl.illinois.edu/elog/musun/run1/399
Dec 7 09:49:59 2008 : 1.6 ppm N_2 impurities injected into TPC starting run 5108. http://www.npl.illinois.edu/elog/musun/run1/446
Dec 11 03:15:32 2008: Switch to CHUPS cleaning off 50ppm N2 and mu+, starting run 6434. http://www.npl.illinois.edu/elog/musun/run1/488
Dec 12 08:09:26 2008: Balloon experiment setup. http://www.npl.illinois.edu/elog/musun/run1/501
Dec 12 10:27:25 2008: Switching to mu- at run 6799, did not work, switched back to mu+ at run 6804. http://www.npl.illinois.edu/elog/musun/run1/503
Dec 13 10:07:35 2008: MuLan tile installed to study the "Cherenkov" component, starting run 7060. http://www.npl.illinois.edu/elog/musun/run1/508
Dec 13 12:15:52 2008: Beam switched back to mu-, starting run 7070. Beam is now mu+ starting on run 7113. http://www.npl.illinois.edu/elog/musun/run1/509
Dec 13 16:57:12 2008: Final run 7175. http://www.npl.illinois.edu/elog/musun/run1/512
Dec 16 05:27:44 2008: N2 balloon experiments starting run 7190, air experiments starting run 7263. http://www.npl.illinois.edu/elog/musun/run1/525
Dec 17 12:17:47 2008: NaI detector removed and thick muon counter installed. muSC/muPC efficiency study starts run 7346. http://www.npl.illinois.edu/elog/musun/run1/529
>
>
Nov 12 22:18:26 2008: WFD crate for TPC installed. ->
Nov 13 20:30:19 2008: First muon beam. ->
Nov 14 09:34:14 2008: EJ-309 neutron counter assembly. ->
Nov 15 08:09:46 2008: Neutron FADC installed. ->
Nov 16 19:16:35 2008: Start of production data taking. ->
Nov 18 13:06:08 2008: Neutron counter setup. ->
Nov 18 17:32:07 2008: Replacement of bad phototubes by Justin. ->
Nov 18 19:03:38 2008: TPC Magnet installed by Bernhard. Slow controls set up. TPC HV set back to 26 kV. ->
Nov 18 23:43:02 2008: Veto for neutron counter is installed. ->
Nov 21 09:31:07 2008: Second neutron detector is installed. ->
Nov 22 23:49:14 2008: NaI installation and 22Na calibration runs. ->
Nov 23 21:39:35 2008: Setting up the new FADC for NaI detector. ->
Nov 24 08:47:47 2008: NaI Setup. ->
Nov 24 10:29:37 2008: Veto for NaI is installed. Veto for neutron detector 1 was unmounted. ->
Nov 25 18:14:10 2008: Ge detector setup. ->
Nov 26 03:42:54 2008: TPC magnet is on after run 1630. (2008-11-24 15:51:13) ->
Nov 26 05:32:40 2008: TPC overpressure valve is installed. ->
Nov 27 04:59:57 2008: Switching to mu+ after run 2379. ->
Nov 27 14:21:50 2008: TPC muSR magnet switched off at run 2457. ->
Dec 1 02:43:30 2008 : NaI and Ndet1 removed. ->
Dec 1 18:26:52 2008 : Ge detector is installed. NaI detector is removed and installed back about at the same place. ->
Dec 3 13:03:13 2008 : Ge detector died after run 3780. ->
Dec 7 09:49:59 2008 : 1.6 ppm N_2 impurities injected into TPC starting run 5108. ->
Dec 11 03:15:32 2008: Switch to CHUPS cleaning off 50ppm N2 and mu+, starting run 6434. ->
Dec 12 08:09:26 2008: Balloon experiment setup. ->
Dec 12 10:27:25 2008: Switching to mu- at run 6799, did not work, switched back to mu+ at run 6804. ->
Dec 13 10:07:35 2008: MuLan tile installed to study the "Cherenkov" component, starting run 7060. ->
Dec 13 12:15:52 2008: Beam switched back to mu-, starting run 7070. Beam is now mu+ starting on run 7113. ->
Dec 13 16:57:12 2008: Final run 7175. ->
Dec 16 05:27:44 2008: N2 balloon experiments starting run 7190, air experiments starting run 7263. ->
Dec 17 12:17:47 2008: NaI detector removed and thick muon counter installed. muSC/muPC efficiency study starts run 7346. ->
 

The Calibration and Analysis During Run1

Changed:
<
<
Nov 13 08:37:49 2008: Laser Measurement. http://www.npl.illinois.edu/elog/musun/run1/88
Nov 16 07:50:47 2008: Energy and time resolutions of prototype TPC. http://www.npl.illinois.edu/elog/musun/run1/123
Nov 16 08:16:56 2008: Alpha source calibration. http://www.npl.illinois.edu/elog/musun/run1/124
Nov 16 08:45:21 2008: Basic Neutron analyzer. http://www.npl.illinois.edu/elog/musun/run1/125
Nov 16 15:26:54 2008: Na22 calibration runs. http://www.npl.illinois.edu/elog/musun/run1/128
Nov 17 02:46:36 2008: muPC beta source test. http://www.npl.illinois.edu/elog/musun/run1/137
Nov 17 03:13:19 2008: muPC beta source test, test pulser on three different amplifiers. http://www.npl.illinois.edu/elog/musun/run1/137
Nov 17 06:34:37 2008: Neutron counter gain studies. http://www.npl.illinois.edu/elog/musun/run1/143
Nov 18 04:05:40 2008: NaI Test runs. http://www.npl.illinois.edu/elog/musun/run1/165
Nov 19 10:41:09 2008: FADC calibration runs. http://www.npl.illinois.edu/elog/musun/run1/191
Nov 21 23:06:55 2008: Neutron detector Na22 calibration runs. http://www.npl.illinois.edu/elog/musun/run1/227
Nov 23 10:44:20 2008: TPC energy distribution runs with different EH. http://www.npl.illinois.edu/elog/musun/run1/249
Nov 23 22:06:55 2008: Basic NaI analyzer. http://www.npl.illinois.edu/elog/musun/run1/256
Nov 24 19:33:10 2008: Energy distributions of special runs. http://www.npl.illinois.edu/elog/musun/run1/274
Nov 26 00:58:09 2008: 241Am and 22Na calibration of NaI detector. http://www.npl.illinois.edu/elog/musun/run1/292
Nov 26 04:32:11 2008: Chromotograph analisis D2 from new TPC, http://www.npl.illinois.edu/elog/musun/run1/297
Nov 27 01:56:20 2008: NaI detector resolution tests.http://www.npl.illinois.edu/elog/musun/run1/307
Nov 27 09:52:31 2008: NaI tests without beam between runs 2280-2333. Back to mu- again after run 2475. http://www.npl.illinois.edu/elog/musun/run1/319
Nov 27 17:34:06 2008: NaI calibration with Am on place. http://www.npl.illinois.edu/elog/musun/run1/323
Nov 28 05:29:45 2008: Analysis D2 for preparation mixture D2 +N2. http://www.npl.illinois.edu/elog/musun/run1/329
Nov 28 17:16:39 2008: WFD tests and TPC sector connection scheme to WFDs. http://www.npl.illinois.edu/elog/musun/run1/335
Nov 29 10:58:32 2008: FADC and WFD calibration sector D, and WFD calibration sector E, D. between runs 2929-2938. http://www.npl.illinois.edu/elog/musun/run1/344
Nov 29 14:37:51 2008: FADC calibration analysis. http://www.npl.illinois.edu/elog/musun/run1/346
Dec 1 01:28:18 2008 : Energy resolutions from special 1 meV pulses. http://www.npl.illinois.edu/elog/musun/run1/355
Dec 1 08:32:08 2008 : Alpha calibration attempt. runs between 3470-3745. http://www.npl.illinois.edu/elog/musun/run1/361
Dec 1 14:21:48 2008 : TPC charge/energy calibration. http://www.npl.illinois.edu/elog/musun/run1/365
Dec 1 19:27:20 2008 : Ge calibration with Am on situ. http://www.npl.illinois.edu/elog/musun/run1/370
Dec 2 07:29:51 2008 : Analysis D2 from TPC. http://www.npl.illinois.edu/elog/musun/run1/379
Dec 2 17:05:18 2008 : Alpha calib with beam TPC Sectors C and D. see MYSQL runs 3713-3732
Dec 7 02:25:48 2008 : Quick version of WFD display. http://www.npl.illinois.edu/elog/musun/run1/438
Dec 7 09:24:32 2008 : TPC Sector B and C calibration runs, starting run 5097 till 5104. http://www.npl.illinois.edu/elog/musun/run1/441
Dec 7 17:06:44 2008 : The drop in "muon lifetime" due to N2 doping. http://www.npl.illinois.edu/elog/musun/run1/454
Dec 9 05:04:39 2008 : Gas analysis D2+N2 run. http://www.npl.illinois.edu/elog/musun/run1/468
Dec 12 11:43:51 2008: Beam momentum calculations for N2 Balloon runs. http://www.npl.illinois.edu/elog/musun/run1/505
Dec 12 16:21:48 2008: Beam momentum calculations for N2 Balloon runs. http://www.npl.illinois.edu/elog/musun/run1/506
Dec 13 13:00:34 2008: Calibration of the amplifiers on the muon beam. http://www.npl.illinois.edu/elog/musun/run1/510
Dec 14 15:20:18 2008: Summary of the gas chromotographic analysis during MuSun Run1. http://www.npl.illinois.edu/elog/musun/run1/520
Dec 15 08:22:34 2008: Ndet2 calibration runs between 7176-7189 http://www.npl.illinois.edu/elog/musun/run1/522
Dec 16 05:27:44 2008: N2 balloon experiments starting run 7190, air experiments starting run 7263. http://www.npl.illinois.edu/elog/musun/run1/525
Dec 18 03:07:27 2008: The quality of the muCS/muPC efficiency measurements before run 7432 is questionable. http://www.npl.illinois.edu/elog/musun/run1/536
>
>
Nov 13 08:37:49 2008: Laser Measurement. ->
Nov 16 07:50:47 2008: Energy and time resolutions of prototype TPC. ->
Nov 16 08:16:56 2008: Alpha source calibration. ->
Nov 16 08:45:21 2008: Basic Neutron analyzer. ->
Nov 16 15:26:54 2008: Na22 calibration runs. ->
Nov 17 02:46:36 2008: muPC beta source test. ->
Nov 17 03:13:19 2008: muPC beta source test, test pulser on three different amplifiers. ->
Nov 17 06:34:37 2008: Neutron counter gain studies. ->
Nov 18 04:05:40 2008: NaI Test runs. ->
Nov 19 10:41:09 2008: FADC calibration runs. ->
Nov 21 23:06:55 2008: Neutron detector Na22 calibration runs. ->
Nov 23 10:44:20 2008: TPC energy distribution runs with different EH. ->
Nov 23 22:06:55 2008: Basic NaI analyzer. ->
Nov 24 19:33:10 2008: Energy distributions of special runs. ->
Nov 26 00:58:09 2008: 241Am and 22Na calibration of NaI detector. ->
Nov 26 04:32:11 2008: Chromotograph analisis D2 from new TPC, ->
Nov 27 01:56:20 2008: NaI detector resolution tests. ->
Nov 27 09:52:31 2008: NaI tests without beam between runs 2280-2333. Back to mu- again after run 2475. ->
Nov 27 17:34:06 2008: NaI calibration with Am on place. ->
Nov 28 05:29:45 2008: Analysis D2 for preparation mixture D2 +N2. ->
Nov 28 17:16:39 2008: WFD tests and TPC sector connection scheme to WFDs. ->
Nov 29 10:58:32 2008: FADC and WFD calibration sector D, and WFD calibration sector E, D between runs 2929-2938. ->
Nov 29 14:37:51 2008: FADC calibration analysis. ->
Dec 1 01:28:18 2008 : Energy resolutions from special 1 meV pulses. ->
Dec 1 08:32:08 2008 : Alpha calibration attempt, runs between 3470-3745. ->
Dec 1 14:21:48 2008 : TPC charge/energy calibration. ->
Dec 1 19:27:20 2008 : Ge calibration with Am on situ. ->
Dec 2 07:29:51 2008 : Analysis D2 from TPC. ->
Dec 2 17:05:18 2008 : Alpha calib with beam TPC Sectors C and D, see MYSQL runs 3713-3732
Dec 7 02:25:48 2008 : Quick version of WFD display. ->
Dec 7 09:24:32 2008 : TPC Sector B and C calibration runs, starting run 5097 till 5104. ->
Dec 7 17:06:44 2008 : The drop in "muon lifetime" due to N2 doping. ->
Dec 9 05:04:39 2008 : Gas analysis D2+N2 run. ->
Dec 12 11:43:51 2008: Beam momentum calculations for N2 Balloon runs. ->
Dec 12 16:21:48 2008: Beam momentum calculations for N2 Balloon runs. ->
Dec 13 13:00:34 2008: Calibration of the amplifiers on the muon beam. ->
Dec 14 15:20:18 2008: Summary of the gas chromotographic analysis during MuSun Run1. ->
Dec 15 08:22:34 2008: Ndet2 calibration runs between 7176-7189 522][->]]
Dec 16 05:27:44 2008: N2 balloon experiments starting run 7190, air experiments starting run 7263. ->
Dec 18 03:07:27 2008: The quality of the muCS/muPC efficiency measurements before run 7432 is questionable. ->
 

Software and Parameter Changes During Run1

Deleted:
<
<
Nov 13 15:36:09 2008: TPC Elow thresholds. http://www.npl.illinois.edu/elog/musun/run1/93
Nov 16 07:00:19 2008: Basic parameters of new TPC. http://www.npl.illinois.edu/elog/musun/run1/121
Nov 17 18:18:00 2008: Changes in WFD Crate. http://www.npl.illinois.edu/elog/musun/run1/152
Nov 18 22:14:57 2008: FO-103-A module replaced in master logic NIM crate, which fanouts TDC400 signal. LB102 Master logic module replaced. http://www.npl.illinois.edu/elog/musun/run1/179
Nov 19 09:14:18 2008: TDC400 check is disabled.http://www.npl.illinois.edu/elog/musun/run1/188
Nov 19 17:54:29 2008: Neutron anticounter HV to 2000. master_2.jed loaded. FADC block signal not inverted. http://www.npl.illinois.edu/elog/musun/run1/195
Nov 20 09:40:38 2008: Separator voltage tunning. http://www.npl.illinois.edu/elog/musun/run1/205
Nov 20 15:45:03 2008: Error in kicker logic is recovered and corrected. http://www.npl.illinois.edu/elog/musun/run1/207
Nov 20 19:32:22 2008: New firmware uploaded into master logic unit LB102. http://www.npl.illinois.edu/elog/musun/run1/217
Nov 22 01:23:37 2008: Voltage Calibration Runs for gondolas. http://www.npl.illinois.edu/elog/musun/run1/228
Nov 23 10:20:11 2008: EH=35 and EH=30 runs (was EH=40). http://www.npl.illinois.edu/elog/musun/run1/248
Nov 23 11:55:27 2008: Delay of FADC gate reducted to 38us from 40us. http://www.npl.illinois.edu/elog/musun/run1/250
Nov 25 13:53:02 2008: New WFD 24NOV08 firmware. http://www.npl.illinois.edu/elog/musun/run1/287
Nov 25 17:04:05 2008: TPC sector E is now in woofters. http://www.npl.illinois.edu/elog/musun/run1/288
Nov 26 01:13:13 2008: TPC sector E is back in FADCs. used to test new WFD firmware between runs 2070-2099. http://www.npl.illinois.edu/elog/musun/run1/295
Nov 27 20:17:59 2008: WFD w/o Sector E in FADC tests between runs 2542-2567. http://www.npl.illinois.edu/elog/musun/run1/324
Nov 28 17:16:39 2008: TPC Sector E connected to WFD, Sector D with FADCs starting from 2691. http://www.npl.illinois.edu/elog/musun/run1/335
Nov 28 17:16:39 2008: TPC Sector D is also connected to WFD starting run 2842. http://www.npl.illinois.edu/elog/musun/run1/335
Nov 28 17:16:39 2008: TPC Sector D back to FADC starting run 2851. http://www.npl.illinois.edu/elog/musun/run1/335
Nov 28 17:16:39 2008: TPC Sector D again in WFDs starting run 2874. http://www.npl.illinois.edu/elog/musun/run1/335
Nov 29 12:55:30 2008: New amp Elow thresh = 350 starting run 2789, from MYSQL
Nov 29 02:24:23 2008: WFD tune: TPC sector E. http://www.npl.illinois.edu/elog/musun/run1/339
Nov 29 05:17:28 2008: New amplifier installed on sector B. http://www.npl.illinois.edu/elog/musun/run1/341
Nov 29 10:58:32 2008: muPC back at 2500 after run 2915. http://www.npl.illinois.edu/elog/musun/run1/344
Nov 30 04:09:45 2008: TPC Sector E connected back to FADC. TPC Sector C connected to WFD. starting run 3199. http://www.npl.illinois.edu/elog/musun/run1/351
Nov 30 04:09:45 2008: FADC boards 5-7 disabled, starting run 3221. http://www.npl.illinois.edu/elog/musun/run1/351
Dec 1 09:46:13 2008 : TPC pressure setpoint changed to 10.1 from 10.2. http://www.npl.illinois.edu/elog/musun/run1/363
Dec 2 03:12:08 2008 : TPC pressure decreased to 10 bar. http://www.npl.illinois.edu/elog/musun/run1/376
Dec 2 14:58:50 2008 : WFD clock frequency reduced from 100 MHz to 60 MHz. Some runs with 125 MHz. WFD DBC reduced from 15 to 10 (80 samples/block). starting run 3673. http://www.npl.illinois.edu/elog/musun/run1/384
Dec 2 17:05:51 2008 : WFD clock frequency 60 MHz, starting run 3705. http://www.npl.illinois.edu/elog/musun/run1/389
Dec 3 08:43:28 2008 : New 02DEC08 firmware release. http://www.npl.illinois.edu/elog/musun/run1/397
Dec 3 21:58:53 2008 : TPC threshold back to 30, between runs 3800-3861. http://www.npl.illinois.edu/elog/musun/run1/402
Dec 4 05:28:12 2008 : New amplifier (shaping time 400ns) installed in sector D. No mention on MYSQL database. My guess is starting somewhere between runs 3916-3960. http://www.npl.illinois.edu/elog/musun/run1/405
Dec 4 12:32:49 2008 : TPC Pressure back to 10.2 bar. http://www.npl.illinois.edu/elog/musun/run1/407
Dec 4 19:04:05 2008 : New FPGA firmware downloaded. http://www.npl.illinois.edu/elog/musun/run1/413
Dec 5 03:24:29 2008 : Data loss in some FADC boards around runs 4245. http://www.npl.illinois.edu/elog/musun/run1/417
Dec 5 14:48:15 2008 : Genna's new amplifier board is installed. http://www.npl.illinois.edu/elog/musun/run1/424
Dec 5 14:48:15 2008 : TPC Sector B in WFDs. http://www.npl.illinois.edu/elog/musun/run1/424
Dec 5 18:08:37 2008 : Bad WFD cable(s). http://www.npl.illinois.edu/elog/musun/run1/428
Dec 9 03:43:42 2008 : Missing TPC pad 57. http://www.npl.illinois.edu/elog/musun/run1/467
Dec 10 02:17:57 2008: Amplifier for TPC sector B has been removed, tested and reinstalled between runs 6100-6141. http://www.npl.illinois.edu/elog/musun/run1/474
Dec 10 03:55:37 2008: Full TPC readout with FADCs, WFDs no longer in use. http://www.npl.illinois.edu/elog/musun/run1/475
Dec 10 18:23:37 2008: Threshold change in NaI veto, NaI veto is now in WFDs. http://www.npl.illinois.edu/elog/musun/run1/482
Dec 10 21:48:01 2008: FADC trigger change beween D2 and D2+N2, relevant runs 6700-6704. http://www.npl.illinois.edu/elog/musun/run1/484
 \ No newline at end of file
Added:
>
>
Nov 13 15:36:09 2008: TPC Elow thresholds. ->
Nov 16 07:00:19 2008: Basic parameters of new TPC. ->
Nov 17 18:18:00 2008: Changes in WFD Crate. ->
Nov 18 22:14:57 2008: FO-103-A module replaced in master logic NIM crate, which fanouts TDC400 signal. LB102 Master logic module replaced. ->
Nov 19 09:14:18 2008: TDC400 check is disabled. ->
Nov 19 17:54:29 2008: Neutron anticounter HV to 2000. master_2.jed loaded. FADC block signal not inverted. ->
Nov 20 09:40:38 2008: Separator voltage tunning. ->
Nov 20 15:45:03 2008: Error in kicker logic is recovered and corrected. ->
Nov 20 19:32:22 2008: New firmware uploaded into master logic unit LB102. ->
Nov 22 01:23:37 2008: Voltage Calibration Runs for gondolas. ->
Nov 23 10:20:11 2008: EH=35 and EH=30 runs (was EH=40). ->
Nov 23 11:55:27 2008: Delay of FADC gate reducted to 38us from 40us. ->
Nov 25 13:53:02 2008: New WFD 24NOV08 firmware. ->
Nov 25 17:04:05 2008: TPC sector E is now in woofters. ->
Nov 26 01:13:13 2008: TPC sector E is back in FADCs. it was used to test new WFD firmware between runs 2070-2099. ->
Nov 27 20:17:59 2008: WFD w/o Sector E in FADC tests between runs 2542-2567. ->
Nov 28 17:16:39 2008: TPC Sector E connected to WFD, Sector D with FADCs starting from 2691. ->
Nov 28 17:16:39 2008: TPC Sector D is also connected to WFD starting run 2842. ->
Nov 28 17:16:39 2008: TPC Sector D back to FADC starting run 2851. ->
Nov 28 17:16:39 2008: TPC Sector D again in WFDs starting run 2874. ->
Nov 29 12:55:30 2008: New amp Elow thresh = 350 starting run 2789, from MYSQL
Nov 29 02:24:23 2008: WFD tune: TPC sector E. ->
Nov 29 05:17:28 2008: New amplifier installed on sector B. ->
Nov 29 10:58:32 2008: muPC back at 2500 after run 2915. ->
Nov 30 04:09:45 2008: TPC Sector E connected back to FADC. TPC Sector C connected to WFD, starting run 3199. ->
Nov 30 04:09:45 2008: FADC boards 5-7 disabled, starting run 3221. ->
Dec 1 09:46:13 2008 : TPC pressure setpoint changed to 10.1 from 10.2. ->
Dec 2 03:12:08 2008 : TPC pressure decreased to 10 bar. ->
Dec 2 14:58:50 2008 : WFD clock frequency reduced from 100 MHz to 60 MHz. Some runs with 125 MHz. WFD DBC reduced from 15 to 10 (80 samples/block), starting run 3673. ->
Dec 2 17:05:51 2008 : WFD clock frequency 60 MHz, starting run 3705. ->
Dec 3 08:43:28 2008 : New 02DEC08 firmware release. ->
Dec 3 21:58:53 2008 : TPC threshold back to 30, between runs 3800-3861. ->
Dec 4 05:28:12 2008 : New amplifier (shaping time 400ns) installed in sector D. No mention on MYSQL database. My guess is starting somewhere between runs 3916-3960. ->
Dec 4 12:32:49 2008 : TPC Pressure back to 10.2 bar. ->
Dec 4 19:04:05 2008 : New FPGA firmware downloaded. ->
Dec 5 03:24:29 2008 : Data loss in some FADC boards around runs 4245. ->
Dec 5 14:48:15 2008 : Genna's new amplifier board is installed. ->
Dec 5 14:48:15 2008 : TPC Sector B in WFDs. ->
Dec 5 18:08:37 2008 : Bad WFD cable(s). ->
Dec 9 03:43:42 2008 : Missing TPC pad 57. ->
Dec 10 02:17:57 2008: Amplifier for TPC sector B has been removed, tested and reinstalled between runs 6100-6141. ->
Dec 10 03:55:37 2008: Full TPC readout with FADCs, WFDs no longer in use. ->
Dec 10 18:23:37 2008: Threshold change in NaI veto, NaI veto is now in WFDs. ->
Dec 10 21:48:01 2008: FADC trigger change beween D2 and D2+N2, relevant runs 6700-6704. ->

Revision 52009-03-20 - SerdarKizilgul

Line: 1 to 1
 
META TOPICPARENT name="MuSunRun1Analysis"
-- SerdarKizilgul - 18 Mar 2009

MuSun Run1 Summary

Line: 12 to 12
 The mysql database has been updated according to elogs.

The overview of the run1 is done by Peter K. \ No newline at end of file

Added:
>
>

Elogs About Documentation

Nov 3 17:09:34 2008:: The scheme of the MuSun DAQ for 2008 run. http://www.npl.illinois.edu/elog/musun/run1/12
Nov 4 11:31:52 2008:: Peter's photo gallery about run1. http://www.npl.illinois.edu/elog/musun/run1/13
Nov 9 12:54:15 2008:: MuCap Manual. http://www.npl.illinois.edu/elog/musun/run1/39
Nov 9 13:06:57 2008:: Useful elog entries from the past. http://www.npl.illinois.edu/elog/musun/run1/40
Nov 9 13:35:26 2008:: FADC Adress Settings. http://www.npl.illinois.edu/elog/musun/run1/43
Nov 10 09:14:05 2008: Run1 preparation from Peter K. http://www.npl.illinois.edu/elog/musun/run1/52
Nov 10 17:27:49 2008: MuSun Run schedule. http://www.npl.illinois.edu/elog/musun/run1/55
Nov 11 06:02:38 2008: Survey measurement report. http://www.npl.illinois.edu/elog/musun/run1/62
Nov 11 14:40:51 2008: TPC pads and cabling map. http://www.npl.illinois.edu/elog/musun/run1/70
Nov 13 07:44:18 2008: Relay scheme for gas alarms. http://www.npl.illinois.edu/elog/musun/run1/87
Nov 14 07:52:18 2008: CVS repository setup. http://www.npl.illinois.edu/elog/musun/run1/100
Nov 15 14:53:26 2008: HowTo for the event display. http://www.npl.illinois.edu/elog/musun/run1/116
Nov 16 00:21:35 2008: TPC respond on beam momentum change. http://www.npl.illinois.edu/elog/musun/run1/118
Nov 16 17:20:56 2008: TPC thresholds and triggers. http://www.npl.illinois.edu/elog/musun/run1/130
Nov 18 15:52:36 2008: FADC switch settings and some technical documents. http://www.npl.illinois.edu/elog/musun/run1/175
Nov 18 19:57:51 2008: Slow control parameters. http://www.npl.illinois.edu/elog/musun/run1/178
Nov 19 01:50:03 2008: How to cure TDC400 order errors. http://www.npl.illinois.edu/elog/musun/run1/182
Nov 19 04:47:38 2008: Parameters of Veto for neutron counter. http://www.npl.illinois.edu/elog/musun/run1/186
Nov 19 09:55:10 2008: Updated shift manual. http://www.npl.illinois.edu/elog/musun/run1/190
Nov 22 15:54:31 2008: Gondola voltage calibration guide by Justin. http://www.npl.illinois.edu/elog/musun/run1/239
Nov 23 18:38:48 2008: Sample pulses in TPC FADC. http://www.npl.illinois.edu/elog/musun/run1/254
Nov 24 08:58:26 2008: uSR magnet values. http://www.npl.illinois.edu/elog/musun/run1/265
Nov 24 14:12:26 2008: Chromotografy anaylsis plan. http://www.npl.illinois.edu/elog/musun/run1/272
Nov 27 08:01:50 2008: N2 doping proposal. http://www.npl.illinois.edu/elog/musun/run1/315
Nov 28 17:16:39 2008: WFD tests and TPC sector connection scheme to WFDs. http://www.npl.illinois.edu/elog/musun/run1/335
Dec 1 03:57:36 2008 : The position of the neutron and NaI detectors. http://www.npl.illinois.edu/elog/musun/run1/357
Dec 1 05:50:40 2008 : Preparation of Nitrogen doped deuterium mixture. http://www.npl.illinois.edu/elog/musun/run1/360
Dec 3 07:25:51 2008 : Preparation of gas samples for 50 ppm doped N2 run. http://www.npl.illinois.edu/elog/musun/run1/394
Dec 5 05:44:54 2008 : The quantity of deuterium inserted into CHUPS. http://www.npl.illinois.edu/elog/musun/run1/421
Dec 5 16:30:36 2008 : WFD map for TPC. http://www.npl.illinois.edu/elog/musun/run1/426
Dec 7 05:22:11 2008 : Impurity of the hydrogen in deuterium. http://www.npl.illinois.edu/elog/musun/run1/440
Dec 10 21:28:11 2008: Trigger files. http://www.npl.illinois.edu/elog/musun/run1/483
Dec 10 22:45:19 2008: Proposal of NaI detector calibration by baloon of N2. http://www.npl.illinois.edu/elog/musun/run1/485
Dec 13 16:57:12 2008: Check list. http://www.npl.illinois.edu/elog/musun/run1/512

Detector and Beam Changes During Run1

Nov 12 22:18:26 2008: WFD crate for TPC installed. http://www.npl.illinois.edu/elog/musun/run1/78
Nov 13 20:30:19 2008: First muon beam. http://www.npl.illinois.edu/elog/musun/run1/95
Nov 14 09:34:14 2008: EJ-309 neutron counter assembly. http://www.npl.illinois.edu/elog/musun/run1/104
Nov 15 08:09:46 2008: Neutron FADC installed. http://www.npl.illinois.edu/elog/musun/run1/110
Nov 16 19:16:35 2008: Start of production data taking. http://www.npl.illinois.edu/elog/musun/run1/133
Nov 18 13:06:08 2008: Neutron counter setup: http://www.npl.illinois.edu/elog/musun/run1/174
Nov 18 17:32:07 2008: Replacement of bad phototubes by Justin. http://www.npl.illinois.edu/elog/musun/run1/176
Nov 18 19:03:38 2008: TPC Magnet installed by Bernhard. Slow controls set up. TPC HV set back to 26 kV. http://www.npl.illinois.edu/elog/musun/run1/177
Nov 18 23:43:02 2008: Veto for neutron counter is installed. http://www.npl.illinois.edu/elog/musun/run1/180
Nov 21 09:31:07 2008: Second neutron detector is installed. http://www.npl.illinois.edu/elog/musun/run1/224
Nov 22 23:49:14 2008: NaI installation and 22Na calibration runs. http://www.npl.illinois.edu/elog/musun/run1/243
Nov 23 21:39:35 2008: Setting up the new FADC for NaI detector. http://www.npl.illinois.edu/elog/musun/run1/255
Nov 24 08:47:47 2008: NaI Setup. http://www.npl.illinois.edu/elog/musun/run1/264
Nov 24 10:29:37 2008: Veto for NaI is installed. Veto for neutron detector 1 was unmounted. http://www.npl.illinois.edu/elog/musun/run1/271
Nov 25 18:14:10 2008: Ge detector setup. http://www.npl.illinois.edu/elog/musun/run1/289
Nov 26 03:42:54 2008: TPC magnet is on after run 1630. (2008-11-24 15:51:13) http://www.npl.illinois.edu/elog/musun/run1/296
Nov 26 05:32:40 2008: TPC overpressure valve is installed. http://www.npl.illinois.edu/elog/musun/run1/299
Nov 27 04:59:57 2008: Switching to mu+ after run 2379. http://www.npl.illinois.edu/elog/musun/run1/312
Nov 27 14:21:50 2008: TPC muSR magnet switched off at run 2457. http://www.npl.illinois.edu/elog/musun/run1/320
Dec 1 02:43:30 2008 : NaI and Ndet1 removed. http://www.npl.illinois.edu/elog/musun/run1/356
Dec 1 18:26:52 2008 : Ge detector is installed. NaI detector is removed and installed back about at the same place. http://www.npl.illinois.edu/elog/musun/run1/369
Dec 3 13:03:13 2008 : Ge detector died after run 3780. http://www.npl.illinois.edu/elog/musun/run1/399
Dec 7 09:49:59 2008 : 1.6 ppm N_2 impurities injected into TPC starting run 5108. http://www.npl.illinois.edu/elog/musun/run1/446
Dec 11 03:15:32 2008: Switch to CHUPS cleaning off 50ppm N2 and mu+, starting run 6434. http://www.npl.illinois.edu/elog/musun/run1/488
Dec 12 08:09:26 2008: Balloon experiment setup. http://www.npl.illinois.edu/elog/musun/run1/501
Dec 12 10:27:25 2008: Switching to mu- at run 6799, did not work, switched back to mu+ at run 6804. http://www.npl.illinois.edu/elog/musun/run1/503
Dec 13 10:07:35 2008: MuLan tile installed to study the "Cherenkov" component, starting run 7060. http://www.npl.illinois.edu/elog/musun/run1/508
Dec 13 12:15:52 2008: Beam switched back to mu-, starting run 7070. Beam is now mu+ starting on run 7113. http://www.npl.illinois.edu/elog/musun/run1/509
Dec 13 16:57:12 2008: Final run 7175. http://www.npl.illinois.edu/elog/musun/run1/512
Dec 16 05:27:44 2008: N2 balloon experiments starting run 7190, air experiments starting run 7263. http://www.npl.illinois.edu/elog/musun/run1/525
Dec 17 12:17:47 2008: NaI detector removed and thick muon counter installed. muSC/muPC efficiency study starts run 7346. http://www.npl.illinois.edu/elog/musun/run1/529

The Calibration and Analysis During Run1

Nov 13 08:37:49 2008: Laser Measurement. http://www.npl.illinois.edu/elog/musun/run1/88
Nov 16 07:50:47 2008: Energy and time resolutions of prototype TPC. http://www.npl.illinois.edu/elog/musun/run1/123
Nov 16 08:16:56 2008: Alpha source calibration. http://www.npl.illinois.edu/elog/musun/run1/124
Nov 16 08:45:21 2008: Basic Neutron analyzer. http://www.npl.illinois.edu/elog/musun/run1/125
Nov 16 15:26:54 2008: Na22 calibration runs. http://www.npl.illinois.edu/elog/musun/run1/128
Nov 17 02:46:36 2008: muPC beta source test. http://www.npl.illinois.edu/elog/musun/run1/137
Nov 17 03:13:19 2008: muPC beta source test, test pulser on three different amplifiers. http://www.npl.illinois.edu/elog/musun/run1/137
Nov 17 06:34:37 2008: Neutron counter gain studies. http://www.npl.illinois.edu/elog/musun/run1/143
Nov 18 04:05:40 2008: NaI Test runs. http://www.npl.illinois.edu/elog/musun/run1/165
Nov 19 10:41:09 2008: FADC calibration runs. http://www.npl.illinois.edu/elog/musun/run1/191
Nov 21 23:06:55 2008: Neutron detector Na22 calibration runs. http://www.npl.illinois.edu/elog/musun/run1/227
Nov 23 10:44:20 2008: TPC energy distribution runs with different EH. http://www.npl.illinois.edu/elog/musun/run1/249
Nov 23 22:06:55 2008: Basic NaI analyzer. http://www.npl.illinois.edu/elog/musun/run1/256
Nov 24 19:33:10 2008: Energy distributions of special runs. http://www.npl.illinois.edu/elog/musun/run1/274
Nov 26 00:58:09 2008: 241Am and 22Na calibration of NaI detector. http://www.npl.illinois.edu/elog/musun/run1/292
Nov 26 04:32:11 2008: Chromotograph analisis D2 from new TPC, http://www.npl.illinois.edu/elog/musun/run1/297
Nov 27 01:56:20 2008: NaI detector resolution tests.http://www.npl.illinois.edu/elog/musun/run1/307
Nov 27 09:52:31 2008: NaI tests without beam between runs 2280-2333. Back to mu- again after run 2475. http://www.npl.illinois.edu/elog/musun/run1/319
Nov 27 17:34:06 2008: NaI calibration with Am on place. http://www.npl.illinois.edu/elog/musun/run1/323
Nov 28 05:29:45 2008: Analysis D2 for preparation mixture D2 +N2. http://www.npl.illinois.edu/elog/musun/run1/329
Nov 28 17:16:39 2008: WFD tests and TPC sector connection scheme to WFDs. http://www.npl.illinois.edu/elog/musun/run1/335
Nov 29 10:58:32 2008: FADC and WFD calibration sector D, and WFD calibration sector E, D. between runs 2929-2938. http://www.npl.illinois.edu/elog/musun/run1/344
Nov 29 14:37:51 2008: FADC calibration analysis. http://www.npl.illinois.edu/elog/musun/run1/346
Dec 1 01:28:18 2008 : Energy resolutions from special 1 meV pulses. http://www.npl.illinois.edu/elog/musun/run1/355
Dec 1 08:32:08 2008 : Alpha calibration attempt. runs between 3470-3745. http://www.npl.illinois.edu/elog/musun/run1/361
Dec 1 14:21:48 2008 : TPC charge/energy calibration. http://www.npl.illinois.edu/elog/musun/run1/365
Dec 1 19:27:20 2008 : Ge calibration with Am on situ. http://www.npl.illinois.edu/elog/musun/run1/370
Dec 2 07:29:51 2008 : Analysis D2 from TPC. http://www.npl.illinois.edu/elog/musun/run1/379
Dec 2 17:05:18 2008 : Alpha calib with beam TPC Sectors C and D. see MYSQL runs 3713-3732
Dec 7 02:25:48 2008 : Quick version of WFD display. http://www.npl.illinois.edu/elog/musun/run1/438
Dec 7 09:24:32 2008 : TPC Sector B and C calibration runs, starting run 5097 till 5104. http://www.npl.illinois.edu/elog/musun/run1/441
Dec 7 17:06:44 2008 : The drop in "muon lifetime" due to N2 doping. http://www.npl.illinois.edu/elog/musun/run1/454
Dec 9 05:04:39 2008 : Gas analysis D2+N2 run. http://www.npl.illinois.edu/elog/musun/run1/468
Dec 12 11:43:51 2008: Beam momentum calculations for N2 Balloon runs. http://www.npl.illinois.edu/elog/musun/run1/505
Dec 12 16:21:48 2008: Beam momentum calculations for N2 Balloon runs. http://www.npl.illinois.edu/elog/musun/run1/506
Dec 13 13:00:34 2008: Calibration of the amplifiers on the muon beam. http://www.npl.illinois.edu/elog/musun/run1/510
Dec 14 15:20:18 2008: Summary of the gas chromotographic analysis during MuSun Run1. http://www.npl.illinois.edu/elog/musun/run1/520
Dec 15 08:22:34 2008: Ndet2 calibration runs between 7176-7189 http://www.npl.illinois.edu/elog/musun/run1/522
Dec 16 05:27:44 2008: N2 balloon experiments starting run 7190, air experiments starting run 7263. http://www.npl.illinois.edu/elog/musun/run1/525
Dec 18 03:07:27 2008: The quality of the muCS/muPC efficiency measurements before run 7432 is questionable. http://www.npl.illinois.edu/elog/musun/run1/536

Software and Parameter Changes During Run1

Nov 13 15:36:09 2008: TPC Elow thresholds. http://www.npl.illinois.edu/elog/musun/run1/93
Nov 16 07:00:19 2008: Basic parameters of new TPC. http://www.npl.illinois.edu/elog/musun/run1/121
Nov 17 18:18:00 2008: Changes in WFD Crate. http://www.npl.illinois.edu/elog/musun/run1/152
Nov 18 22:14:57 2008: FO-103-A module replaced in master logic NIM crate, which fanouts TDC400 signal. LB102 Master logic module replaced. http://www.npl.illinois.edu/elog/musun/run1/179
Nov 19 09:14:18 2008: TDC400 check is disabled.http://www.npl.illinois.edu/elog/musun/run1/188
Nov 19 17:54:29 2008: Neutron anticounter HV to 2000. master_2.jed loaded. FADC block signal not inverted. http://www.npl.illinois.edu/elog/musun/run1/195
Nov 20 09:40:38 2008: Separator voltage tunning. http://www.npl.illinois.edu/elog/musun/run1/205
Nov 20 15:45:03 2008: Error in kicker logic is recovered and corrected. http://www.npl.illinois.edu/elog/musun/run1/207
Nov 20 19:32:22 2008: New firmware uploaded into master logic unit LB102. http://www.npl.illinois.edu/elog/musun/run1/217
Nov 22 01:23:37 2008: Voltage Calibration Runs for gondolas. http://www.npl.illinois.edu/elog/musun/run1/228
Nov 23 10:20:11 2008: EH=35 and EH=30 runs (was EH=40). http://www.npl.illinois.edu/elog/musun/run1/248
Nov 23 11:55:27 2008: Delay of FADC gate reducted to 38us from 40us. http://www.npl.illinois.edu/elog/musun/run1/250
Nov 25 13:53:02 2008: New WFD 24NOV08 firmware. http://www.npl.illinois.edu/elog/musun/run1/287
Nov 25 17:04:05 2008: TPC sector E is now in woofters. http://www.npl.illinois.edu/elog/musun/run1/288
Nov 26 01:13:13 2008: TPC sector E is back in FADCs. used to test new WFD firmware between runs 2070-2099. http://www.npl.illinois.edu/elog/musun/run1/295
Nov 27 20:17:59 2008: WFD w/o Sector E in FADC tests between runs 2542-2567. http://www.npl.illinois.edu/elog/musun/run1/324
Nov 28 17:16:39 2008: TPC Sector E connected to WFD, Sector D with FADCs starting from 2691. http://www.npl.illinois.edu/elog/musun/run1/335
Nov 28 17:16:39 2008: TPC Sector D is also connected to WFD starting run 2842. http://www.npl.illinois.edu/elog/musun/run1/335
Nov 28 17:16:39 2008: TPC Sector D back to FADC starting run 2851. http://www.npl.illinois.edu/elog/musun/run1/335
Nov 28 17:16:39 2008: TPC Sector D again in WFDs starting run 2874. http://www.npl.illinois.edu/elog/musun/run1/335
Nov 29 12:55:30 2008: New amp Elow thresh = 350 starting run 2789, from MYSQL
Nov 29 02:24:23 2008: WFD tune: TPC sector E. http://www.npl.illinois.edu/elog/musun/run1/339
Nov 29 05:17:28 2008: New amplifier installed on sector B. http://www.npl.illinois.edu/elog/musun/run1/341
Nov 29 10:58:32 2008: muPC back at 2500 after run 2915. http://www.npl.illinois.edu/elog/musun/run1/344
Nov 30 04:09:45 2008: TPC Sector E connected back to FADC. TPC Sector C connected to WFD. starting run 3199. http://www.npl.illinois.edu/elog/musun/run1/351
Nov 30 04:09:45 2008: FADC boards 5-7 disabled, starting run 3221. http://www.npl.illinois.edu/elog/musun/run1/351
Dec 1 09:46:13 2008 : TPC pressure setpoint changed to 10.1 from 10.2. http://www.npl.illinois.edu/elog/musun/run1/363
Dec 2 03:12:08 2008 : TPC pressure decreased to 10 bar. http://www.npl.illinois.edu/elog/musun/run1/376
Dec 2 14:58:50 2008 : WFD clock frequency reduced from 100 MHz to 60 MHz. Some runs with 125 MHz. WFD DBC reduced from 15 to 10 (80 samples/block). starting run 3673. http://www.npl.illinois.edu/elog/musun/run1/384
Dec 2 17:05:51 2008 : WFD clock frequency 60 MHz, starting run 3705. http://www.npl.illinois.edu/elog/musun/run1/389
Dec 3 08:43:28 2008 : New 02DEC08 firmware release. http://www.npl.illinois.edu/elog/musun/run1/397
Dec 3 21:58:53 2008 : TPC threshold back to 30, between runs 3800-3861. http://www.npl.illinois.edu/elog/musun/run1/402
Dec 4 05:28:12 2008 : New amplifier (shaping time 400ns) installed in sector D. No mention on MYSQL database. My guess is starting somewhere between runs 3916-3960. http://www.npl.illinois.edu/elog/musun/run1/405
Dec 4 12:32:49 2008 : TPC Pressure back to 10.2 bar. http://www.npl.illinois.edu/elog/musun/run1/407
Dec 4 19:04:05 2008 : New FPGA firmware downloaded. http://www.npl.illinois.edu/elog/musun/run1/413
Dec 5 03:24:29 2008 : Data loss in some FADC boards around runs 4245. http://www.npl.illinois.edu/elog/musun/run1/417
Dec 5 14:48:15 2008 : Genna's new amplifier board is installed. http://www.npl.illinois.edu/elog/musun/run1/424
Dec 5 14:48:15 2008 : TPC Sector B in WFDs. http://www.npl.illinois.edu/elog/musun/run1/424
Dec 5 18:08:37 2008 : Bad WFD cable(s). http://www.npl.illinois.edu/elog/musun/run1/428
Dec 9 03:43:42 2008 : Missing TPC pad 57. http://www.npl.illinois.edu/elog/musun/run1/467
Dec 10 02:17:57 2008: Amplifier for TPC sector B has been removed, tested and reinstalled between runs 6100-6141. http://www.npl.illinois.edu/elog/musun/run1/474
Dec 10 03:55:37 2008: Full TPC readout with FADCs, WFDs no longer in use. http://www.npl.illinois.edu/elog/musun/run1/475
Dec 10 18:23:37 2008: Threshold change in NaI veto, NaI veto is now in WFDs. http://www.npl.illinois.edu/elog/musun/run1/482
Dec 10 21:48:01 2008: FADC trigger change beween D2 and D2+N2, relevant runs 6700-6704. http://www.npl.illinois.edu/elog/musun/run1/484

 \ No newline at end of file

Revision 42009-03-20 - SerdarKizilgul

Line: 1 to 1
 
META TOPICPARENT name="MuSunRun1Analysis"
-- SerdarKizilgul - 18 Mar 2009

MuSun Run1 Summary

The first MuSun musun run was started Nov. 3rd and completed Dec. 18th of 2008 at PSI, Switzerland.

Changed:
<
<
Total 7405 runs were collected during one and a half month of run period. 5183 of these runs (4532 mu-, 653 mu+) are marked as a good quality production run and takes 7.5 TB disk space ftp server NCSA (mss.ncsa.uiuc.edu).
>
>
Total 7405 runs were collected during one month of actual run period. 5183 of these runs (4532 mu-, 653 mu+) are marked as a good quality production run and takes 7.5 TB disk space ftp server NCSA (mss.ncsa.uiuc.edu).
  During the runs, logs are recorded online to run1 elogs and summarized for data classification.

Revision 32009-03-19 - SerdarKizilgul

Line: 1 to 1
 
META TOPICPARENT name="MuSunRun1Analysis"
-- SerdarKizilgul - 18 Mar 2009

MuSun Run1 Summary

Changed:
<
<
The first MuSun run started Nov. 3rd and completed Dec. 18th of 2008 at PSI.
>
>
The first MuSun musun run was started Nov. 3rd and completed Dec. 18th of 2008 at PSI, Switzerland.
 
Changed:
<
<
Datasets contains During the runs, logs are recorded online to run1 elogs and summarized for data classification.
>
>
Total 7405 runs were collected during one and a half month of run period. 5183 of these runs (4532 mu-, 653 mu+) are marked as a good quality production run and takes 7.5 TB disk space ftp server NCSA (mss.ncsa.uiuc.edu).

During the runs, logs are recorded online to run1 elogs and summarized for data classification.

  The mysql database has been updated according to elogs.

Revision 22009-03-19 - SerdarKizilgul

Line: 1 to 1
 
META TOPICPARENT name="MuSunRun1Analysis"
-- SerdarKizilgul - 18 Mar 2009

MuSun Run1 Summary

The first MuSun run started Nov. 3rd and completed Dec. 18th of 2008 at PSI.

Changed:
<
<
During the runs, logs are recorded online to run1 elogs and summarized for data classification.
>
>
Datasets contains During the runs, logs are recorded online to run1 elogs and summarized for data classification.
  The mysql database has been updated according to elogs.

Revision 12009-03-18 - SerdarKizilgul

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="MuSunRun1Analysis"
-- SerdarKizilgul - 18 Mar 2009

MuSun Run1 Summary

The first MuSun run started Nov. 3rd and completed Dec. 18th of 2008 at PSI.

During the runs, logs are recorded online to run1 elogs and summarized for data classification.

The mysql database has been updated according to elogs.

The overview of the run1 is done by Peter K.

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.