Tags:
, view all tags
* Set ALLOWTOPICCHANGE = PeterKammel

-- PeterKammel - 01 Sep 2006

Systematics

Halo monitor project

Plans

Realization

  • New printed circuit board arrived 9/28/06 at UIUC
  • After John drilled screw slits, shipped to Urs Greuter 9/30/06 (4 drilled, 4 original boards)
  • Aked PSI electronics to assemble 3 boards, Alexey to test them with APD
  • After that is done, ship to UIUC for complete assembly and test with scintillators
  • Two 10x100x0.5 mm3 and two 10x100x1 mm3 ready at PSI (Peter W.)

Todo (UIUC)

Topic attachments
I Attachment History Action Size Date Who Comment
PDFpdf halo.pdf r1 manage 160.5 K 2006-09-01 - 14:25 PeterKammel  
Edit | Attach | Watch | Print version | History: r3 < r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r1 - 2006-09-01 - PeterKammel
 
  • Edit
  • Attach
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2020 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback